My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4920 24TH AVE W 2023-06-22
>
Address Records
>
24TH AVE W
>
4920
>
4920 24TH AVE W 2023-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 2:54:57 PM
Creation date
6/22/2023 2:52:01 PM
Metadata
Fields
Template:
Address Document
Street Name
24TH AVE W
Street Number
4920
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> VERETT p City of Everett <br /> WASHINGTQN <br /> Permit Number: P2106-027 Description: PLUMBING FOR NEW(2)STORY SFR WITH ATTACHED <br /> GARAGE <br /> Applied:6/22/2021 Approved: 11/30/2021 Site Address:4920 24TH AVE W <br /> Issued:3/17/2022 Finaled: 11/28/2022 City,State Zip Code: EVERETT,WA 98203 <br /> Status: FINALED Applicant: MALLORIE HEFLEY <br /> Parent Permit: B2106-046 Owner:4900 24TH AVE W LLC <br /> Parent Project: Contractor: FULLWILER CONSTRUCTION INC <br /> Details: <br /> PLUMBING FOR NEW(2)STORY SFR WITH ATTACHED GARAGEip"•i `t + al,; >4.,..tif•I .rr:>rii°,�ti�.^ul.". '�Ag'�y+y f.✓:.. ,, ?rA ,,.. . <br /> a;mow t Lr t # M1kq ga 4,S♦1"u. ^,F tp k r,•ro'ale "' ��( 1.' r 1. <br /> r 5.+�! . w. �.r,�al } .,' �ssr:r •,. uv:.�rrh�!y s� .� �� �"'!��� , ��� ,F., r v f .r <br /> � A t1 �'� <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PLUMB 03-ROUGH CORRECTION <br /> 7/5/2022 7/5/2022 IN BILLY APPLETON REQUIRED eTRAKiT Inspection Request <br /> Notes: <br /> 7/1/2022 7:39 AM FULLWILER CONSTRUCTION INC <br /> 4920 is Lot 2. <br /> Contact Name:Ben McKinlay <br /> Site Address:4920 24TH AVE W <br /> Phone:4253454234 <br /> e-Mail:ben@fullwilerconstruction.com <br /> (7/5/2022 11:20 AM BGA) <br /> 1.Install cleanout on vertical 3"stack in garage for end of line cleanout,cleanout in crawl is farther than 20 ft.From crawl space opening. <br /> 2. Install proper size cleanout on 3"drain for powder bath. <br /> PLUMB 03-ROUGH CORRECTION <br /> 7/13/2022 7/13/2022 IN BILLY APPLETON REQUIRED eTRAKiT Inspection Request <br /> Notes: <br /> 7/8/2022 3:44 PM FULLWILER CONSTRUCTION INC <br /> Plumbing corrections <br /> Contact Name:Ben McKinlay <br /> Site Address:4920 24TH AVE W <br /> Phone:4253454234 <br /> e-Mail:ben@fullwilerconstruction.com <br /> (7/13/2022 9:47 AM BGA) <br /> 1.There is a leak coming from the 3"waste line serving the a master bath toilet,overhead in the garage. <br /> Printed:Thursday, May,Ma ,2023 1-of 2 ) .-T <br /> SUPER ION <br />
The URL can be used to link to this page
Your browser does not support the video tag.