My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4920 24TH AVE W 2023-06-22
>
Address Records
>
24TH AVE W
>
4920
>
4920 24TH AVE W 2023-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 2:54:57 PM
Creation date
6/22/2023 2:52:01 PM
Metadata
Fields
Template:
Address Document
Street Name
24TH AVE W
Street Number
4920
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSjgn Envelope ID: 14A43E24-9433-4A70-9AAA7B2B010272 • <br /> ‘A, Et) -1)0 ', <br /> MI PUBLIC WORKS DEPARTMENT <br /> ILI Utilities Division,3200 Cedar S -:.8 a us <br /> Everett WA 98201 <br /> EVERETT 425-257-8800 1E <br /> WASHINCiTUN COST ESTIMATE SHEET <br /> Mai 1 7 2022 <br /> Receipt # Date Paid <br /> X Cost of Work Order $880.00 CITY ortvERmo <br /> Permit SerYiC TT <br /> Cost of Service Order Service C7rt.mi # <br /> Requested By: Thad Newport <br /> Contact Person Mallorie Hefley Telephone# 360 631-5922 x3 <br /> Email Address: mallorie@fullwilerconstruction.com Date of Request 12-7-2021 <br /> Property Owner(name) 4900 24th Ave W LLC <br /> Charge Cost to(name if different than owner) Attn: Mallorie Hefley <br /> Address 526 N. West Ave#147 City Arlington, WA Zip 98223 <br /> Installation Location L ici 2.D 2� a,Ift. W W. <br /> Installation type/description/size/etc. Modify existing service from 2" to 1". City crew to remove <br /> existing 2" meter and setter then install 1" setter and meter. City will reuse existing meter box. <br /> This estimate is fo of#2 6 16 ANY)/i 4 j ) <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs,the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Signed Cost Estimate sheet must be sent to PermitServices@EverettWA.gov to move forward. <br /> *Permit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 4"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> cc: PermitServices@EverettWA.gov <br /> Material $714.00 Matt Welborn-Email&HC <br /> Labor and Benefits $79.00 Randy Allen-Email <br /> Jim Spooner-HC <br /> Equipment Rental $45.00 Sabrina Good-Email <br /> Tax $42.00 Grant Moen-Email <br /> Restoration Thad Newport-Email <br /> Terri Jorgenson-Email <br /> TOTAL $880.00 <br /> Prepared by: ppaper (,) Date Estimate Prepared 1-12-2022 <br /> Accepted by: cl <br /> itrit, (k ,1 Representing Fullwiler construction Inc. <br /> �9rfii�.8A6#��ey <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:1#Common\clerical\Cost.est1202214920 24th Ave W l inch CEFP <br />
The URL can be used to link to this page
Your browser does not support the video tag.