My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2525 RUCKER AVE 2023-06-22
>
Address Records
>
RUCKER AVE
>
2525
>
2525 RUCKER AVE 2023-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 3:23:49 PM
Creation date
6/22/2023 3:23:00 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2525
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> L. Multiple Hood Venting(606.3.6): <br /> 1. Number of hoods vented by a single duct system: Proposed: 1 <br /> A single-duct system may serve more than one hood located in the same story of the building, <br /> provided that the interconnecting ducts do not penetrate any fire resistance rated construction and <br /> are located in adjoining rooms; and the grease duct system does not serve a solid fuel-fired <br /> appliance. <br /> 2. An unlisted hood outlet shall serve not more than a 12-foot section of hood. <br /> M. Provide seismic restraint vertical support and attachment details for the hood;shall be prepared <br /> by someone knowledgeable in structural engineering. (IMC 301.16, IBC 1613,ASCE7-05) Hoods <br /> and equipment over 400 pounds require calculations and details for review. <br /> N. Additional Information—Type I Hood Only: <br /> 1. Grease filters shall be installed at a minimum 45 degrees angle and <br /> equipped with drip tray and gutter beneath lower edge of filters. Proposed: 45 degrees <br /> 2. Distance between lowest edge of grease filters and cooking surface of: <br /> Grill,fryer, exposed flame shall not be not be less than 2 ft. Proposed: 3' 11" ft <br /> Exposed charcoal, charbroil shall be not less than 3%ft. (507,11) Proposed: 3' 11" ft. <br /> 3. Type 1 hood and duct shall have clearances from construction of: Proposed: 0 in. <br /> GWB on metal stud (minimum 3" clearance required) (506.3.6;507.2.6) Hooa-o"per submittal with <br /> GWB on woo )d stud (minimum 18" clearance required) (506.3.6; 507.2,6 Standoff0"with 3M and IntemaFirel IDuctnsulationwrap Duct- <br /> PROTECTED <br /> UNPROTECTED (Combustible Construction) (With 1-hour Fire-Rated <br /> Material and Stud Construction) <br /> Hoodg -0"per submittal with Hood-0"per submittal with <br /> q p Hood Min. Req. 18 in. Pro oseQtandoff and Internal Insult n <br /> Min. Req. 3 in. Proposecistandoff and Internal Insulation <br /> tn. <br /> Duct-0"with 3M Fire Duct wrap Duct-0"with 3M Fire Duct a rap <br /> Duct Min. Req. 18 in. Proposed in. Min. Req. 3 in. Proposed in. <br /> 4. Hoods less than 12 inches from ceilings or walls shall be flashed solidly. <br /> 5. All joints and seams shall be made with continuous liquid-tight weld or braze made on the external <br /> surface of the duct system. Vibration insulation connector may be used provided it consists of <br /> noncombustible packing in a metal sleeve joint. (506.3.2, 506.3.2.4) Joints shall be smooth and <br /> accessible for inspection. (506.3.2.5)A light test shall be performed. <br /> 6. Exhaust fans used for discharging grease exhaust shall be positioned so that the discharge will not <br /> impinge on the roof. The fan shall be provided with an adequate drain opening at the lowest point to <br /> permit drainage of grease to a suitable collection device. (506.5.2) <br /> 7. Fire Suppression System Fire Suppression System shall be per Fire Code. Portable extinguisher <br /> shall also be provided per Fire Code. Provide automatic shutoff for make-up air, exhaust system, <br /> and appliances when suppression system is activated. Dependent on suppression agent and <br /> manufacturer's requirements. Separate permit is required. <br /> 8. Performance test certificate of the hood system shall be provided to owner before final approval. <br /> Test shall verify property operation, the rate of exhaust, makeup air, capture and containment <br /> performance of the exhaust at normal operating conditions. (507.6) <br /> 9. A pollution-control unit may be required for side-wall terminations. (506,3.13.2) <br /> References: <br /> 1—International Mechanical Code(2015) <br /> 2—International Building Code(2015) <br /> 3—International Fire Code(2015) <br /> 4—International Fuel Gas Code(2015) <br />
The URL can be used to link to this page
Your browser does not support the video tag.