Laserfiche WebLink
Table of Contents <br /> 1.0 Introduction 1 <br /> 2.0 Site Description 3 <br /> 2.1 Existing Conditions 3 <br /> 2.2 Proposed Construction Activities 3 <br /> 3.0 Construction Stormwater BMPs 5 <br /> 3.1 The 12 BMP Elements 5 <br /> 3.1.1 Element#1 —Mark Clearing Limits 5 <br /> 3.1.2 Element#2—Establish Construction Access 5 <br /> 3.1.3 Element #3 —Control Flow Rates 5 <br /> ' 3.1.4 Element#4—Install Sediment Controls 6 <br /> 3.1.5 Element#5 —Stabilize Soils 6 <br /> 3.1.6 Element#6—Protect Slopes 6 <br /> 3.1.7 Element#7—Protect Drain Inlets 7 <br /> 3.1.8 Element#8 —Stabilize Channels and Outlets 7 <br /> 3.1.9 Element#9—Control Pollutants 7 <br /> 3.1.10 Element #10—Control Dewatering 7 <br /> 3.1.11 Element#11 —Maintain BMPs 7 <br /> ' 3.1.12 Element#12 —Manage the Project 18 <br /> 3.2 Site Specific BMPs /, /''�/� 10 <br /> 4.0 Construction Phasing and BMP Implementation 11 <br /> 5.0 Pollution Prevention Team 12 <br /> 5.1 Roles and Responsibilities 12 <br /> 5.2 Team Members 13 <br /> 6.0 Site Inspections and Monitoring 14 <br /> 6.1 Site Inspection 14 <br /> 6.1.1 Site Inspection Frequency 15 <br /> 6.1.2 Site Inspection Documentation 15 <br /> 6.2 Stormwater Quality Monitoring 15 <br /> 6.2.1 Turbidity Sampling 15 <br /> 6.2.2 pH Sampling 16 <br /> 7.0 Reporting and Recordkeeping 17 <br /> 7.1 Recordkeeping 17 <br /> ' 7.1.1 Site Log Book 17 <br /> 7.1.2 Records Retention 17 <br /> 7.1.3 Access to Plans and Records 17 <br /> 7.1.4 Updating the SWPPP 17 <br /> 7.2 Reporting 18 <br /> 7.2.1 Discharge Monitoring Reports 18 <br /> 7.2.2 Notification of Noncompliance 18 <br /> 7.2.3 Permit Application and Changes 18 <br /> SWPPP Page i <br /> Smith Island Terminal—Site Grading March 2017 <br />