My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3620 36TH PL NE 2023-06-22
>
Address Records
>
36TH PL NE
>
3620
>
3620 36TH PL NE 2023-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 4:26:05 PM
Creation date
6/22/2023 4:22:50 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH PL NE
Street Number
3620
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> 1.0 Introduction <br /> This Stormwater Pollution Prevention Plan (SWPPP) has been prepared in accordance with the <br /> National Pollutant Discharge Elimination System (NPDES) stormwater permit requirements for <br /> the proposed site grading for Smith Island Terminal, LLC. The project is located at 3620 36th P1 <br /> NE, Everett, Washington 98201 within a portion of Section 5, Township 29 North, Range 5 East, <br /> WM. The project site is currently zoned as M-2 (Heavy Manufacturing) and is comprised of the <br /> following tax parcels: 29050500100600, 29050500400200, 29050500100400, 29050500400500, <br /> and 29050500101300. <br /> The site is bounded to the south by Pacific Topsoils Inc, to the west by Cedar Grove <br /> Composting, to the north by the Union Slough and to the east by the Burlington Northern Santa <br /> Fe Railroad. Concrete Nor'west occupies parcel number 29050500400200. <br /> Smith Island Terminal is proposing to place fill material within the above mentioned parcels for <br /> future development of the site. The grading and fill of the site is to occur in multiple phases due <br /> to the current operation of Concrete Nor'west's facilities and to maintain access to Cedar Grove <br /> Composting. The total area of the six parcels is 68 acres. Approximately 52 acres will be affected <br /> by the grading and fill activity. <br /> Construction activities will include grading of the site and related swale and drainage <br /> construction. The fill material will be sourced from onsite and brought in from off-site. <br /> The purpose of this SWPPP is to describe the proposed construction activities and all temporary <br /> and permanent erosion and sediment control (TESC) measures, pollution prevention measures, <br /> inspection/monitoring activities, and recordkeeping that will be implemented during the <br /> proposed construction projects. The objectives of the SWPPP are to: <br /> 1. Implement Best Management Practices (BMPs) to prevent erosion and sedimentation, <br /> ' and to identify, reduce, eliminate or prevent stormwater contamination and water <br /> pollution from construction activity. <br /> 2. Prevent violations of surface water quality, ground water quality, or sediment <br /> management standards. <br /> ' 3. Prevent, during the construction phase, adverse water quality impacts including impacts <br /> on beneficial uses of the receiving water by controlling peak flow rates and volumes of <br /> stormwater runoff at the Permittee's outfalls and downstream of the outfalls. <br /> This SWPPP was prepared using the Ecology SWPPP Template downloaded from the Ecology <br /> website. It is based on the requirements set forth in the Construction Stormwater General Permit <br /> and the Stormwater Management Manual for Western Washington(SWMMWW 2005). The p <br /> report is divided into seven main sections with several appendices that include stormwater <br /> related reference materials. The topics presented in the each of the main sections are: <br /> SWPPP Page 1 <br /> Smith Island Terminal— Site Grading March 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.