My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1800 41ST ST 2023-06-23
>
Address Records
>
41ST ST
>
1800
>
1800 41ST ST 2023-06-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2023 8:25:26 AM
Creation date
6/23/2023 8:22:46 AM
Metadata
Fields
Template:
Address Document
Street Name
41ST ST
Street Number
1800
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> I <br /> I <br /> EXECUTIVE SUMMARY <br /> • Executive Summary <br /> I . Vicinity Map <br /> SECTION 1 -PREPARATION OF STORMWATER SITE PLANS <br /> I . Task 1: Define and map the study area <br /> • Task 2: Review all available information on the study area <br /> • Task 3: Field inspect the study area <br /> I . Task 4: Describe the drainage system,and its existing and predicted problems <br /> • Appendix 1 A—Existing Condition Summary Documents <br /> • Appendix 1 B—Geotechnical Engineer's Report <br /> I . Appendix 1C—Downstream Flowpath Analysis <br /> SECTION 2-STORMWATER POLLUTION PREVENTION PLAN(SWPPP) <br /> I . 1.0-Introduction <br /> • 2.0-Site Description <br /> • 3.0-Construction Stormwater BMPs <br /> I . 4.0-Construction Phasing and BMP Implementation <br /> • 5.0-Pollution Prevention Team <br /> • 6.0-Site Inspections&Monitoring <br /> • 7.0- Reporting&Recordkeeping <br /> I . Appendix 2A-Site Plan with BMP Measures <br /> • Appendix 2B-SWPPP Project Summary <br /> • Appendix 2C-Alternative BMPs <br /> I . Appendix 2D-General Permit <br /> • Appendix 2E-Site Log&Inspection Forms <br /> SECTION 3—SOURCE CONTROL OF POLLUTION <br /> • Source Control of Pollution <br /> I <br /> SECTION 4-PRESERVATION OF NATURAL DRAINAGE SYSTEMS AND OUTFACES <br /> I . Natural Drainage Course Description <br /> SECTION 5-ON-SITE STORMWATER MANAGEMENT <br /> I . Existing Site Hydrology <br /> • Developed Site Hydrology <br /> • Performance Standards <br /> • On-Site Stormwater Management BMPs <br /> II • Appendix 5A—Stormwater Basin Figures <br /> I <br /> I1800 41st Street—Parking Expansion <br /> Drainage Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.