Laserfiche WebLink
TABLE OF CONTENTS <br /> I <br /> I <br /> EXECUTIVE SUMMARY <br /> • Executive Summary <br /> I . Vicinity Map <br /> SECTION 1 -PREPARATION OF STORMWATER SITE PLANS <br /> I . Task 1: Define and map the study area <br /> • Task 2: Review all available information on the study area <br /> • Task 3: Field inspect the study area <br /> I . Task 4: Describe the drainage system,and its existing and predicted problems <br /> • Appendix 1 A—Existing Condition Summary Documents <br /> • Appendix 1 B—Geotechnical Engineer's Report <br /> I . Appendix 1C—Downstream Flowpath Analysis <br /> SECTION 2-STORMWATER POLLUTION PREVENTION PLAN(SWPPP) <br /> I . 1.0-Introduction <br /> • 2.0-Site Description <br /> • 3.0-Construction Stormwater BMPs <br /> I . 4.0-Construction Phasing and BMP Implementation <br /> • 5.0-Pollution Prevention Team <br /> • 6.0-Site Inspections&Monitoring <br /> • 7.0- Reporting&Recordkeeping <br /> I . Appendix 2A-Site Plan with BMP Measures <br /> • Appendix 2B-SWPPP Project Summary <br /> • Appendix 2C-Alternative BMPs <br /> I . Appendix 2D-General Permit <br /> • Appendix 2E-Site Log&Inspection Forms <br /> SECTION 3—SOURCE CONTROL OF POLLUTION <br /> • Source Control of Pollution <br /> I <br /> SECTION 4-PRESERVATION OF NATURAL DRAINAGE SYSTEMS AND OUTFACES <br /> I . Natural Drainage Course Description <br /> SECTION 5-ON-SITE STORMWATER MANAGEMENT <br /> I . Existing Site Hydrology <br /> • Developed Site Hydrology <br /> • Performance Standards <br /> • On-Site Stormwater Management BMPs <br /> II • Appendix 5A—Stormwater Basin Figures <br /> I <br /> I1800 41st Street—Parking Expansion <br /> Drainage Report <br />