My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1800 41ST ST 2023-06-23
>
Address Records
>
41ST ST
>
1800
>
1800 41ST ST 2023-06-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2023 8:25:26 AM
Creation date
6/23/2023 8:22:46 AM
Metadata
Fields
Template:
Address Document
Street Name
41ST ST
Street Number
1800
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Bill Helsley <br /> December 17,20l 5 <br /> With stable unyielding subgrade prepared as recommended, for this light duty parking application we recommend <br /> using the following pavement section: <br /> • Two inches of hot mix asphalt(HMA)over four inches of crushed rock base(CRB) <br /> The paving materials used should conform to the Washington State Department of Transportation (WSDOT) <br /> specifications for'/z-inch class HMA and CRB. <br /> Limitations <br /> We completed our work in accordance with generally accepted geotechnical engineering practices. No other <br /> warranty, expressed or implied, is made. This letter is the copyrighted property of Terra Associates, Inc. and is <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> intended for specific application to the Everett Parking project. This letter is for the exclusive use of Site <br /> Development Associates and their authorized representatives. <br /> The analyses and recommendations presented in this letter are based on data obtained from the test holes done on- <br /> site. Variations in soil conditions can occur, the nature and extent of which may not become evident until <br /> construction. if variations appear evident, Terra Associates, Inc. should be requested to reevaluate the <br /> recommendations in this report prior to proceeding with construction. <br /> We trust the information presented is sufficient to meet your current needs. If you have any questions or require <br /> additional information please call. <br /> Sincere) C� <br /> TE <br /> �.� <br /> Princ o �, ��r,` � �•� <br /> Attachm •; 1($tglag_ •)oration Location Plan <br /> igdres2 through 6—Test Hole Logs <br /> Figure 7—Laboratory Particle Size Distribution Report <br /> Project No.T-7332 <br /> Page No.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.