My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1800 41ST ST 2023-06-23
>
Address Records
>
41ST ST
>
1800
>
1800 41ST ST 2023-06-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2023 8:25:26 AM
Creation date
6/23/2023 8:22:46 AM
Metadata
Fields
Template:
Address Document
Street Name
41ST ST
Street Number
1800
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Monitoring Personnel—Personnel responsible for conducting water quality <br /> monitoring;for most sites this person is also the CESCL. <br /> 5.2 TEAM MEMBERS <br /> Names and contact information for those identified as members of the pollution prevention team <br /> are provided in the project summary in Appendix 2B. <br /> 6.0 —SITE INSPECTIONS AND MONITORING <br /> Monitoring includes visual inspection, monitoring for water quality parameters of concern, and <br /> documentation of the inspection and monitoring findings in a site log book. A site log book will be <br /> maintained for all on-site construction activities and will include: <br /> • A record of the implementation of the SWPPP and other permit requirements; <br /> • Site inspections; and, <br /> • Stormwater quality monitoring. <br /> For convenience,the inspection forma and water quality monitoring forms included in Appendix 2E of this <br /> report include the required information for the site log book. This SWPPP may function as the site log <br /> book, if desired, or the forms may be separated and included in a separate site log book. However, if <br /> separated, the site log book must be maintained on-site or within reasonable access to the site and be <br /> made available upon request to Ecology or the local jurisdiction. <br /> 6.1 SITE INSPECTION <br /> All BMPs will be inspected, maintained, and repaired as needed to assure continued performance <br /> of their intended function. The inspector will be a Certified Erosion and Sediment Control Lead <br /> (CESCL) per BMP C160. The name and contact information for the CESCL is provided in <br /> Section 5 of this SWPPP. <br /> Site inspection will occur in all areas disturbed by construction activities and at all stormwater <br /> discharge points. Stormwater will be examined for the presence of suspended sediment, <br /> turbidity, discoloration, and oily sheen. The site inspector will evaluate and document the <br /> effectiveness of the installed BMPs and determine if it is necessary to repair or replace any of the <br /> BMPs to improve the quality of stormwater discharges. All maintenance and repairs will be <br /> documented in the site log book or forms provided in this document. All new BMPs or design <br /> changes will be documented in the SWPPP as soon as possible. <br /> 1800 41st Street—Parking Expansion <br /> Drainage Report <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.