Laserfiche WebLink
4. Implement additional treatment BMPs as soon as possible, but within 7 days of <br /> the first 250 NTU exceedance. <br /> 1 <br /> 5. Describe inspection results and remedial actions that are taken in the site log <br /> book and in monthly discharge monitoring reports. <br /> 6.2.2 pH Sampling <br /> Stormwater runoff will be monitored for pH starting on the first day of any activity that <br /> includes more than 40 yards of poured or recycled concrete, or after the application of <br /> "Engineered Soils"such as, Portland cement treated base, cement kiln dust, or fly ash. <br /> This does not include fertilizers. For concrete work, pH monitoring will start the first day <br /> concrete is poured and continue until 3 weeks after the last pour. For engineered soils, <br /> the pH monitoring period begins when engineered soils are first exposed to precipitation <br /> and continue until the area is fully stabilized. <br /> Stormwater samples will be collected daily from all points of discharge from the site and <br /> measured for pH using a calibrated pH meter, pH test kit, or wide range pH indicator <br /> paper. If the measured pH is 8.5 or greater, the following steps will be conducted: <br /> 1. Prevent the high pH water from entering storm drains or surface water. <br /> 2. Adjust or neutralize the high pH water if necessary using appropriate technology <br /> such as CO2 sparging (liquid or dry ice). <br /> 3. Contact Ecology if chemical treatment other than CO2 sparging is planned. <br /> 7.0 —REPORTING AND RECORDKEEPING <br /> 7.1 RECORDKEEPING <br /> 7.1.1 Site Log Book <br /> A site log book will be maintained for all on-site construction activities and will include: <br /> • A record of the implementation of the SWPPP and other permit requirements; <br /> • Site inspections; and, <br /> • Stormwater quality monitoring. <br /> For convenience, the inspection form and water quality monitoring forms included in <br /> Appendix 2E of this report include the required information for the site log book. <br /> 1800 41st Street—Parking Expansion <br /> Drainage Report <br /> I <br />