Laserfiche WebLink
PROJECT TEAM MEMBERS: <br /> Title Name(s) Phone Number <br /> Certified Erosion&Sediment Control Lead <br /> Resident Engineer Ken McIntyre (425)486-6533 <br /> Emergency Ecology Contact Puget Sound Office (425)649-7000 <br /> Emergency Owner Contact <br /> Non-Emergency Ecology Contact Northwest Region (425)649-7000 <br /> Monitoring Personnel <br /> * The rest of the project team shall be assigned and * <br /> listed above prior to the pre-construction meeting <br /> ESTIMATED CONSTRUCTION SCHEDULE: <br /> • Construction Start Date April 2016 <br /> • Install ESC Measures April 2016 <br /> • Construction End Date August 2016 <br /> CONSTRUCTION BMP LIST: <br /> • High Visibility Plastic or Metal Fence(BMP C103) <br /> • Silt Fence (BMP C233) <br /> • Storm Drain Inlet Protection (BMP C220) <br /> • Materials on Hand(BMP C150) <br /> • Detention Pond Or Vault <br /> • Temporary and Permanent Seeding (BMP C120) <br /> • Plastic Covering (BMP C123) <br /> 1800 41 st Street—Parking Expansion <br /> Drainage Report <br />