My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6920 SEAWAY BLVD 2023-06-23
>
Address Records
>
SEAWAY BLVD
>
6920
>
6920 SEAWAY BLVD 2023-06-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2023 8:28:45 AM
Creation date
6/23/2023 8:27:51 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
6920
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ix <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E1911-170 Description: REPLACE LIGHTS AND RECEPTS AND FIRE CABLING <br /> Applied: 11/25/2019 Approved: 11/25/2019 Site Address:6920 SEAWAY BLVD POD 2-C <br /> Issued: 11/25/2019 Finaled:4/14/2020 City,State Zip Code: EVERETT,WA 98203-5829 <br /> Status: FINALED Applicant:<NONE> <br /> Parent Permit: B1909-034 Owner: FLUKE ELECTRONICS CORP <br /> Parent Project: Contractor: EVERGREEN ELECTRICAL SYS LLC <br /> Details: <br /> UPGRADE LIGHTING TO LED- <br /> INCLUDES 35 LV DEVICES**FA1912-002 <br /> REPLACE LIGHTS AND RECEPTS AND FIRE CABLING <br /> -1 t p,, , , I!q *,„). <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 12/16/2019 12/16/2019 ELEC 06-ROUGH IN STEVE BANKS PARTIAL <br /> APPROVAL <br /> Notes: <br /> 425-877-8344 <br /> (12/16/2019 2:01 PM SKB) <br /> Pod C phase 1. <br /> 1/8/2020 1/8/2020 ELEC 07-TGRID STEVE BANKS PARTIAL <br /> APPROVAL <br /> Notes: <br /> Phase 1 <br /> 1/10/2020 1/13/2020 ELEC 06-ROUGH IN STEVE BANKS NOT READY <br /> Notes: <br /> POD 2C <br /> CH R IS:425-877-8344 <br /> for lights&fire cableing <br /> (1/13/2020 11:59 AM SKB) <br /> Nothing to inspect. <br /> 2/13/2020 2/13/2020 ELEC 09-FINAL MIKE BEARDA PARTIAL <br /> APPROVAL <br /> Notes: <br /> PHASE I FINAL <br /> (2/13/2020 2:29 PM MCB) <br /> Ok Final phase 1 including fire alarm wiring. <br /> Printed:Thursday,08 June,2023 K, 1 of 2 % SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.