10: Control DeWatering <br /> DeWatering is not expected for this project. <br /> 11: Maintain BMPs <br /> The construction supervisor will be responsible for maintaining all BMPs during construction <br /> and working with the City to relocate or add BMPs as necessary as site conditions change. <br /> BMPs should be inspected and maintained as needed after every rain event producing more <br /> than 1/4" of rain in a 24-hour period. Also, BMPs shall be inspected on a weekly basis even <br /> if site work is not occurring. <br /> . 12: Manage the Project <br /> It will be the responsibility of the Contractor and Developer to manage this project and <br /> coordinate with the City Inspector and Engineer. <br /> Inspection and Monitoring: <br /> Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of.erosion.and sediment control. The person must have skills to first assess the <br /> site conditions and construction activities that could impact the quality of stormwater, and <br /> second assess the effectiveness of erosion and sediment control measures used to control <br /> the quality of stormwater discharges. Whenever inspection and/or monitoring reveals that <br /> the BMPs identified in the Construction SWPPP are inadequate, due to the actual discharge <br /> of or potential to discharge a significant amount of any pollutant, appropriate BMPs or design <br /> changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SWPPP shall be retained on-site or within reasonable access to the site. <br /> The SWPPP shall be modified whenever there is a change in the design, construction, <br /> operation, or maintenance at the construction site that has, or could have, a significant effect <br /> on the discharge of pollutants to waters of the state. <br /> The SWPPP shall be modified if, during inspections or investigations conducted by the <br /> owner/operator, or the applicable local or state regulatory authority, it is determined that the <br /> SWPPP is ineffective in eliminating or significantly minimizing,pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to include additional <br /> or modified BMPs designed to correct problems identified. Revisions to the SWPPP shall <br /> be completed within seven days following inspection. <br /> 13: Protect On-Site Stormwater Management BMPs for Runoff from Hard Surfaces <br /> • -The'proposedeve1spreader for roof'dispersion-will'belocated within the Critical Area Buffer <br /> and will be protected from construction. In addition, the landscaping adjacent to the <br /> proposed driveways will be treated with amended soils prior to project completion. <br /> Seahurst SP 18-1015 <br /> May 2020 Page 8 <br />