My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2700 34TH ST 2023-06-23
>
Address Records
>
34TH ST
>
2700
>
2700 34TH ST 2023-06-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2023 3:56:17 PM
Creation date
6/23/2023 3:55:23 PM
Metadata
Fields
Template:
Address Document
Street Name
34TH ST
Street Number
2700
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2 REPORTING <br /> 5.2.1 Discharge Monitoring Reports <br /> Cumulative soil disturbance is one(1)acre or larger;therefore,Discharge Monitoring <br /> Reports(DMRs)will be submitted to the Washington Department of Ecology monthly.If <br /> there was no discharge during a given monitoring period the DMR will be submitted as <br /> required,reporting"No Discharge".The DMR due date is fifteen(15)days following the <br /> end of each calendar month. <br /> DMRs will be reported online through Ecology's WQWebDMR System. <br /> To sign up for WQWebDMR go to: <br /> http://www.ecy.wa.gov/programs/wq/permits/paris/webdmr.html <br /> 5.2.2 Notification of Noncompliance <br /> If any of the terms and conditions of the permit is not met,and the resulting <br /> noncompliance may cause a threat to human health or the environment,the following <br /> actions will be taken: <br /> 1. Ecology will be notified within 24-hours of the failure to comply by calling the <br /> applicable Regional office ERTS phone number(Regional office numbers listed <br /> below). <br /> 2. Immediate action will be taken to prevent the discharge/pollution or otherwise stop or <br /> correct the noncompliance.If applicable,sampling and analysis of any noncompliance <br /> will be repeated immediately and the results submitted to Ecology within five(5)days <br /> of becoming aware of the violation. <br /> 3. A detailed written report describing the noncompliance will be submitted to Ecology <br /> within five(5)days,unless requested earlier by Ecology. <br /> Specific information to be included in the noncompliance report is found in Special <br /> Condition S5.F.3 of the CSWGP. <br /> 6.0 REFERENCES <br /> Pacific Groundwater Group(PGG),2019. Everett Steel Site,Cleanup Action Plan, <br /> Everett Washington,2019 <br /> EVERETT STEEL SWPPP <br /> AUGUST 2019 P gG <br />
The URL can be used to link to this page
Your browser does not support the video tag.