<br /> A. GENERAL C. COATING SYSTEM SPECIFICATIONS 1. THE LATEST EDITION OF THE AMERICAN INSTITUTE OF 12. THE CONTRACTOR SHALL PROVIDE CONTINUOUS 23. THE LATEST EDITION OF ALL PERMITTED AND APPROVED
<br /> ARCHITECTS DOCUMENT A201"GENERAL CONDITIONS OF SUPERVISION AND DIRECT ALL WORK WHILE ANY PLANS PERTAINING TO THIS PROJECT SHALL BE KEPT IN
<br /> 1. ALL PAINT PRODUCT LINES SHALL BE SHERWIN WILLIAMS 1. DTM ACRYLIC COATING(SERIES B66)BY SHERWIN THE CONTRACT FOR CONSTRUCTION"ARE INCLUDED IN SUBCONTRACTORS OR WORKERS ARE ONSITE,USING A PLAN BOX AND SHALL NOT BE USED BY WORKERS.ALL UNLESS SPECIFICALLY NOTED OTHERWISE BY T-MOBILE. WILLIAMS CO.1MIL DFT PER COAT APPLIED IN TWO THESE SPECIFICATIONS AS IF COMPLETELY HIS OR HER BEST SKILL AND ATTENTION.THE CONSTRUCTION SETS SHALL REFLECT THE SAME T Mobile-
<br /> APPLY COATS OVER DTM BONDING PRIMER(666A50). REPRODUCED HEREIN. CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ALL INFORMATION.THE CONTRACTOR SHALL ALSO MAINTAIN
<br /> 2. CONTRACTOR SHALL PREPARE ALL SURFACES AND CONSTRUCTION MEANS,METHODS,TECHNIQUES, IN GOOD CONDITION,ONE COMPLETE SET OF PLANS
<br /> APPLY ALL FINISHES PER LATEST EDITION OF 2. 100%ACRYLIC,LATEX COATING EQUIVALENT TO A-100 2. THIS FACILITY IS AN UNOCCUPIED PCS PROCEDURES,SEQUENCES,AND COORDINATION OF ALL WITH ALL REVISIONS,ADDENDA AND CHANGE ORDERS 19807 NORTH CREEK PKWY N
<br /> MANUFACTURER'S SPECIFICATIONS. (SERIES A-82)BY SHERWIN WILLIAMS CO.1 MIL DFT PER TELECOMMUNICATIONS SITE AND IS EXEMPT FROM ADA - - PORTIONS OF THE CONTRACTED WORK. ON THE PREMISES AT ALL TIMES.THESE ARE TO BE BOTHELL,WA 98011
<br /> COAT APPLIED IN TWO COATS OVER SPECIFIED PRIMER. ACCESS REQUIREMENTS. UNDER THE CARE OF THE CONSTRUCTION
<br /> 3. COMPLY WITH MANUFACTURERS WRITTEN 13. WORKMANSHIP THROUGHOUT SHALL BE OF THE BEST SUPERINTENDENT.
<br /> INSTRUCTIONS REGARDING SUFFICIENT DRYING TIME D. PAINT&PRIMER 3. PRIOR TO SUBMISSION OF BIDS,THE CONTRACTORS QUALITY OF THE TRADE INVOLVED,AND SHALL MEET OR
<br /> BETWEEN COATS WITH PROVISIONS AS RECOMMENDED PARTICIPATING SHALL VISIT THE JOB SITE WITH THE EXCEED THE FOLLOWING MINIMUM REFERENCE 24. THE CONTRACTOR SHALL REMOVE ALL RUBBISH AND
<br /> BY MANUFACTURER FOR EXISTING WEATHER ANTENNAS CONSTRUCTION AND CONTRACT DOCUMENTS TO STANDARDS FOR QUALITY AND PROFESSIONAL WASTE MATERIALS ON A DAILY BASIS,EXCEPT FOR THAT
<br /> CONDITIONS. PRIMER-KEM AQUA E61-W525 CONFIRM THAT THE PROJECT CAN BE ACCOMPLISHED AS CONSTRUCTION PRACTICE: SPECIFIED AS THE PROPERTY OF THE BUILDING OR S m a rt I i n k
<br /> TOPCOAT-COROTHANE II B65W200/B60V22 DESIGNED HEREIN,AS WELL AS TO FAMILIARIZE PROPERTY OWNER AND SHALL EXERCISE STRICT
<br /> 4. FINISH COLOR AND TEXTURE OF ALL PAINTED SURFACES THEMSELVES WITH ALL FIELD CONDITIONS AFFECTING NRCA NATIONAL ROOFING CONTRACTORS ASSOCIATION CONTROL OVER SITE CLEANING THROUGHOUT
<br /> SHALL MATCH EXISTING ADJACENT SURFACES UNLESS BTS CABINET THE PROPOSED PROJECT INCLUDING DEMOLITION, O'HARE INTERNATIONAL CENTER CONSTRUCTION AND FINAL CLEAN-UP UPON
<br /> OTHERWISE NOTED BY T-MOBILE. PRIMER-KEM AQUA E61-W525 ELECTRICAL,MECHANICAL AND STRUCTURAL 10255 W.HIGGINS ROAD,SUITE 600 COMPLETION OF WORK.ALL AREAS ARE TO BE LEFT IN A
<br /> TOPCOAT-COROTHANE II B65W200/B60V22 INSTALLATIONS PRIOR TO PROCEEDING WITH ROSEMONT,IL 60018-5607 BROOM CLEAN CONDITION AT THE END OF EACH DAY I
<br /> 5. ALL PAINT MATERIAL DATA SHEETS SHALL BE PROVIDED CONSTRUCTION.SHOULD ANY ERRORS,OMISSION,OR THEN AT A VACUUM CLEAN CONDITION,FREE FROM
<br /> TO THE T-MOBILE CONSTRUCTION MANAGER. COAXIAL JUMPER CABLES DISCREPANCIES BE FOUND,THE GENERAL CONTRACTOR SMACNA SHEET METAL AND AIR CONDITIONING PAINT SPOTS,DUST OR SMUDGES OF ANY NATURE AT
<br /> PRIMER-AS REQUIRED FOR ADHESION.APPLY ONE SHALL IMMEDIATELY NOTIFY IN WRITING,THE T-MOBILE CONTRACTORS COMPLETION OF WORK. I N F I N I G YS
<br /> 6. PREPARE PREVIOUSLY PAINTED SURFACE BY LIGHT COAT OF KEM CONSTRUCTION MANAGER AND THE ARCHITECT. NATIONAL ASSOCIATION
<br /> SANDING WITH 400 GRIT SANDPAPER AND AQUA WATER REDUCIBLE PRIMER E61 W25 4201 LAFAYETTE CENTER DRIVE 25. THE GENERAL CONTRACTOR MUST PERFORM WORK
<br /> NON-HYDROCARBON WASH.PREPARE GALVANIZED REDUCED 25% 4. IN THE EVENT OF DISCREPANCIES WITHIN THESE CHANTILLY,VA 20151-1219 DURING PROPERTY OWNER'S PREFERRED HOURS TO
<br /> SURFACES BY ACID ETCH OR SOLVENT CLEANING IN TOPCOAT-2 COATS COROTHANE II POLYURETHANE DRAWINGS,THE CONTRACTOR SHALL INCLUDE THE AVOID DISRUPTION OF NORMAL ACTIVITY. FROM ZERO TO I N F I N I GY
<br /> ACCORDANCE WITH SSPC-SP1. B65W200/860V2 MORE COSTLY OR EXTENSIVE WORK IN THE BID,UNLESS IILP INTERNATIONAL INSTITUTE FOR LATH AND PLASTER the solutions are endless
<br /> SPECIFICALLY DIRECTED OTHERWISE BY T-MOBILE.IF A 820 TRANSFER ROAD 26. ALL EXPOSED METAL SHALL BE HOT-DIPPED
<br /> 7. FURNISH DROP CLOTHS,SHIELDS,MASKING AND OTHER RAW STEEL DISCREPANCY EXISTS AND THE PROJECT MANAGER AND ST. PAUL,MN 55114-1406 GALVANIZED. 2500 W.HIGGINS RD.STE.500
<br /> PROTECTIVE METHODS TO PREVENT SPRAY OR PRIMER-KEM BOND HS B50WZ4,DMT ACRYLIC PRIMER ARCHITECT ARE NOT NOTIFIED,THE GENERAL ` HOFFMAN ESTATES,IL 6016E
<br /> DROPPINGS FROM DAMAGING ADJACENT SURFACES AND TOPCOAT-2 COATS COROTHANE II POLYURETHANE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ALL 14. INSTALL ALL EQUIPMENT AND MATERIALS PER THE 27. SEAL ALL PENETRATIONS THROUGH FIRE-RATED AREAS
<br /> FACILITIES. B65W200/B60V2 COSTS INCURRED TO REPAIR OR CORRECT ALL LATEST EDITION OF THE MANUFACTURER'S WITH U.L,LISTED OR FIRE MARSHALL APPROVED
<br /> PROBLEMS THAT RESULT. INSTALLATION SPECIFICATIONS UNLESS OTHERWISE MATERIALS IF AND WHERE APPLICABLE TO THIS FACILITY T-MOBILE SITE:
<br /> 8. APPLY PAINT BY AIRLESS SPRAY,SANDING LIGHTLY GALVANIZED METAL INDICATED BY T-MOBILE,OR WHERE LOCAL CODES OR AND PROJECT SITE. SE02044A
<br /> BETWEEN EACH SUCCEEDING ENAMEL COAT ON FLAT ACID ETCH WITH COMMERCIAL ETCH OR VINEGAR 5. THESE DRAWINGS SHALL NOT BE SCALED AS THESE REGULATIONS TAKE PRECEDENCE.
<br /> SURFACES.APPLY MATERIAL TO ACHIEVE A COATING NO PRIMER COAT AND DRAWINGS ARE INTENDED TO BE FOR DIAGRAMMATIC 28. PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A BOEING FWY-SNO PUD-
<br /> THINNER THAN THE DRY FILM THICKNESS INDICATED. FINISH COAT(GALVITE HIGH SOLIDS OR DTM PURPOSES ONLY.FIGURED DIMENSIONS HAVE 15. THE CONTRACTOR SHALL VERIFY,COORDINATE,AND RATING OF NOT LESS THAN 2-A OR 2-A1OBC WITHIN 75 SE25XC526
<br /> PRIMER/FINISH) PRECEDENCE OVER DRAWING SCALE AND DETAIL PROVIDE ALL NECESSARY BLOCKING,BACKING, FEET TRAVEL DISTANCE TO ALL PORTIONS OF THE
<br /> 9. APPLY BLOCK FILTER TO CONCRETE BLOCK DRAWINGS HAVE PRECEDENCE OVER SMALL SCALE FRAMING,HANGERS OR OTHER SUPPORTS FOR ALL PROJECT AREA UNDER CONSTRUCTION.
<br /> CONSTRUCTION AND ENSURE COMPLETE COVERAGE STAINLESS STEEL DRAWINGS.CONTRACTOR SHALL CHECK THE ACCURACY ITEMS.
<br /> WITH PORES COMPLETELY FILLED. PRIMER-OTM WASH PRIMER,B71Y1 OF ALL DIMENSIONS IN THE FIELD.UNLESS SPECIFICALLY 29. ELECTRICAL POWER SYSTEM SHALL BE GROUNDED PER
<br /> TOPCOAT-2 COATS COROTHANE II POLYURETHANE NOTED,DO NOT FABRICATE ANY MATERIALS,OR BEGIN 16. THE CONTRACTOR AND ALL SUBCONTRACTORS SHALL NEC ARTICLES 250 AND 810.
<br /> 10. CONTRACTOR SHALL CORRECT RUNS,SAGS,MISSES B65W200B60V2 ANY CONSTRUCTION UNTIL THE ACCURACY OF DRAWING GIVE ALL REQUIRED CONSTRUCTION NOTICES AND 1802 75TH ST W
<br /> AND OTHER DEFECTS INCLUDING INADEQUATE DIMENSIONS HAS BEEN VERIFIED AGAINST ACTUAL FIELD SHALL COMPLY WITH ALL APPLICABLE LOCAL CODES, 30. ALL NEW OPENINGS IN THE EXTERIOR ENVELOPE OF
<br /> COVERAGE AS DIRECTED BY THE T-MOBILE PRE-PRIMED STEEL DIMENSIONS. REGULATIONS,LAWS AND ORDINANCES,AS WELL AS THE CONDITIONED SPACES SUCH AS AT WALL AND ROOF EVERETT,WA 98203
<br /> CONSTRUCTION MANAGER.REPAINT AS NECESSARY TO TOUCH UP ANY RUST OR UN-PRIMED STEEL WITH KEM STATE DEPARTMENT OF INDUSTRIAL RELATIONS PENETRATIONS SHALL BE CAULKED OR SEALED TO LIMIT SNOHOMISH COUNTY
<br /> ACHIEVE SURFACES THAT ARE SMOOTH,EVENLY BOND HS, 6. THE CONTRACTOR SHALL INCLUDE IN HIS OR HER BID REGULATIONS,INCLUDING BUT NOT LIMITED TO THE INFILTRATION OF AIR AND MOISTURE.
<br /> COATED WITH UNIFORM SHEEN AND FREE FROM SSOWZ4 ALL MATERIALS,EQUIPMENT,APPURTENANCES AND DIVISION OF OCCUPATIONAL SAFETY AND HEALTH
<br /> BLEMISHES. LABOR NECESSARY TO COMPLETE THE WORK AS (OSHA). 31. UPON COMPLETION OF CONSTRUCTION,T-MOBILE
<br /> ALUMINUM&COPPER INDICATED OR IMPLIED BY THESE DRAWINGS. CONSTRUCTION MANAGER SHALL CONDUCT A
<br /> B. PAINTING SCOPE PRIMER-DTM WASH PRIMER,B71Y1 17. THE CONTRACTOR SHALL PROTECT ALL PROPERTY WALK-THRU WITH PROPERTY OWNER OR
<br /> TOPCOAT-2 COATS COROTHANE II POLYURETHANE 7. CONTRACTOR SHALL NOTIFY THE T-MOBILE FROM DAMAGE THAT MAY OCCUR DURING REPRESENTATIVE OF PROPERTY OWNER. 160'-2"MONOPOLE
<br /> 1. PAINT THE FOLLOWING MATERIALS AND SYSTEMS 865W200/B60V2 CONSTRUCTION MANAGER,THE PROPERTY OWNER AND CONSTRUCTION.ANY DAMAGE TO NEW AND EXISTING
<br /> CHECKED BELOW WITH THE COATING SYSTEM THE ARCHITECT IF ANY DETAILS ARE CONSIDERED FINISHES,CONSTRUCTION,STRUCTURE,LANDSCAPING, 32. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
<br /> INDICATED. CONCRETE MASONRY IMPRACTICAL,UNSUITABLE,UNSAFE,NOT WATERPROOF, CURBS,STAIRS,OR EQUIPMENT,ETC.SHALL BE MAINTAINING ALL SYSTEM EQUIPMENT IN A CLEAN DRAWINGS ISSUED FOR:
<br /> PRIMER-PRO MAR EXTERIOR BLOCK FILLER OR NOT WITHIN CUSTOMARY TRADE PRACTICE.IF WORK IMMEDIATELY REPAIRED OR REPLACED TO THE WORKING ORDER UNTIL ACCEPTANCE OF THE PROJECT
<br /> PAINTING SCOPE TOPCOAT-2 COATS A-100 LATEX HOUSE&TRIM,SHEEN IS PERFORMED,IT WILL BE ASSUMED THAT THERE IS NO SATISFACTION OF T-MOBILE AND THE PROPERTY BY T-MOBILE. REV. DATE DRAWN DESCRIPTION OAIOC
<br /> TO MATCH OBJECTION TO ANY DETAIL.DETAILS ARE INTENDED TO OWNER'S REPRESENTATIVE,AT THE EXPENSE OF THE
<br /> COATING DO SHOW THE END RESULT OF THE DESIGN.MINOR CONTRACTOR. 33. INSTALL ALL EQUIPMENT AND MATERIALS PER THE A 06130/21 RCD PREIMNARV REVIEW ER
<br /> SURFACE TO BE PAINTED SYSTEM PAINT NOT N/A CONCRETE STUCCO(EXISTING) MODIFICATIONS MAY BE REQUIRED TO SUIT JOB LATEST EDITION OF THE MANUFACTURER'S B OS/21/21 EPR REV.PER COMMENTS/1A ER
<br /> PAINT 2 COATS A-100 LATEX HOUSE&TRIM,SHEEN TO MATCH CONDITIONS,AND SHALL BE INCLUDED AS PART OF THE 18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR,AND INSTALLATION SPECIFICATIONS UNLESS SPECIFICALLY
<br /> BTS UNIT X WORK. SHALL REPLACE OR REMEDY,ANY FAULTY,IMPROPER, OTHERWISE INDICATED,OR WHERE LOCAL CODES OR 0 00102/21 ERR 100%CONSTRUCTION ER
<br /> ALL EQUIPMENT&CABINETS STUCCO OR INFERIOR MATERIALS OR WORKMANSHIP OR ANY REGULATION TAKE PRECEDENCE.
<br /> OTHER THAN THE BTS UNIT X PRIMER-PRO MAR MASONRY CONDITONER 8. EXISTING ELEVATIONS AND LOCATIONS SHALL BE DAMAGE WHICH SHALL APPEAR WITHIN ONE YEAR AFTER
<br /> ANTENNA COVERS,TILT B-46-W21000 VERIFIED BY THE CONTRACTOR BEFORE THE COMPLETION AND ACCEPTANCE OF THE WORK BY
<br /> BRACKETS,MOUNTING TOPCOAT-SUPERPAINT A-80 SERIES A-89 SATIN A-84 CONSTRUCTION.IF THEY DIFFER FROM THOSE SHOWN T-MOBILE UNDER THIS CONTRACT.
<br /> BRACKETS AND ASSOCIATED SEE SEE GLOSS ON THE PLANS,THE CONTRACTOR SHALL NOTIFY THE
<br /> HARDWARE,CABLE AND CABLE PLANS PLANS T-MOBILE CONSTRUCTION MANAGER AND THE 19. IT SHALL BE THE RESPONSIBILITY OF THE GENERAL
<br /> COVERS EXPOSED TO VIEW, WOOD ARCHITECT SO THAT MODIFICATIONS CAN BE MADE CONTRACTOR TO PROTECT AND LOCATE,OR CONTACT
<br /> EXPOSED CONDUIT AND PRIMER-A-100 EXTERIOR ALKYD WOOED PRIMER BEFORE PROCEEDING WITH THE WORK. AN OUTSIDE AGENCY TO LOCATE,ALL EXISTING
<br /> HANGERS,ETC. Y-24W20 UTILITIES REGARDLESS OF WHETHER OR NOT SHOWN
<br /> FLASHING UNITS,METAL TRIM X TOPCOAT-2 COATS A-100 LATEX HOUSE&TRIM SHEEN 9. THE CONTRACTOR SHALL VERIFY ALL TELEPHONE& HEREIN.THE CONTRACTOR SHALL BEAR ALL EXPENSES
<br /> AND OTHER METAL SURFACES TO RADIO EQUIPMENT LAYOUTS,SPECIFICATIONS, FOR THE REPAIR OR REPLACEMENT OF UTILITIES OR
<br /> STUCCO,CONCRETE, MATCH ADJACENT SURFACES - PERFORMANCE,INSTALLATION AND FINAL LOCATIONS OTHER PROPERTY DAMAGED IN CONJUNCTION WITH THE (t21ê
<br /> CONCRETE BLOCK AND X WITH T-MOBILE CONSTRUCTION MANAGER PRIOR TO EXECUTION OF WORK.CEMENTIOUS TYPE FINISH SYSTEMS. BEGINNING WORK.THE CONTRACTOR SHALL BEPLYWOOD,LUMBER AND WOODRESPONSIBLE FOR COORDINATING ALL WORK WITH 20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
<br /> TRIM INCLUDING THE BACK SIDE XERICSSON RADIO SYSTEMS. COMPLETE SECURITY OF THE PROJECT SITE WHILE THEOF ALL SCREEN WALLS JOB IS IN PROGRESS AND UNTIL THE JOB IS COMPLETEDDRYWALL X 10. ALL SYMBOLS&ABBREVIATIONS USED ON THESE AND ACCEPTED BY T-MOBILE.CONCRETE POLES X DRAWINGS ARE CONSIDERED CONSTRUCTIONMETAL POLES AND METAL POLE STANDARDS.IF THE CONTRACTOR HAS QUESTIONS 21. THE CONTRACTOR SHALL PROVIDE TEMPORARY WATER, TBR�
<br /> STAND-OFF X REGARDING THEIR EXACT MEANING,THE T-MOBILE POWER AND TOILET FACILITIES AS REQUIRED BY THE ASs�ONALE�G`
<br /> CONSTRUCTION MANAGER AND THE ARCHITECT SHALL PROPERTY OWNER,T-MOBILE,AND THE CITY OR
<br /> BE NOTIFIED FOR CLARIFICATION BEFORE THE GOVERNING AGENCY.
<br /> CONTRACTOR PROCEEDS WITH THE WORK.
<br /> 22. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR
<br /> 11. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REDLINING THE CONSTRUCTION DOCUMENTS TO SHEET TITLE:
<br /> PERMITS,LICENSES AND INSPECTIONS NECESSARY FOR ILLUSTRATE THE AS-BUILT CONDITION OF THE SITE.THIS
<br /> PERFORMANCE OF THE WORK AND INCLUDE THOSE IN SHALL BE DONE AFTER THE SITE HAS BEEN AWARDED SPECIFICATIONS
<br /> THE COST OF THE WORK TO T-MOBILE. FINAL INSPECTION BY THE RESPONSIBLE BUILDING
<br /> AGENCY.ONE SET OF REDLINED DRAWINGS SHALL BE &NOTES
<br /> PROVIDED TO THE T-MOBILE CONSTRUCTION MANAGER.
<br /> SHEET NUMBER: r� REVISION.
<br /> 2 PAINT SPECIFICATIONS 1 GENERAL SPECIFICATIONS T-2 0
<br /> THIS DOCUMENT AND rHF IDEAS AND DESIGNS INCORPORATED HEREIN AS AN INSTRUMENT OF PROFESSIONA.SERVICE.ARE THE PROPERTY OFINFINIGY ETIGINEERING,Pi_LE AND ARP NOT TO SE USED,INWHOLE OR IN PART FORGIVES PROJECTS WITHOUT TEE WRIT FEN AU THORI7A110N CF ITFIVIGY ENGINEERING.PI TO IT ISUFAWFJI.FOR ANlPERSON OA/END ANY ASPECT OS THESE ORAWITISS WITHOUT THE WRIT TEV APPROVAL OF THE PRJFcSc..IC
<br /> NA_OF RECORD.
<br /> CITY OF EVERETT
<br /> REVIEWED FOR PERMIT
<br />
|