Laserfiche WebLink
v <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> MI <br /> WASHINGTON <br /> 1/27/2023 1/27/2023 BLDG 16-FINAL KURT KECK CORRECTION <br /> REQUIRED <br /> Notes: <br /> mulatush@gmail.corn <br /> 206-697-9981 <br /> 1.Exterior ramp is too steep.Needs to be 1 inch drop in 12 inches max.2.Add interconnected smoke detector outside bedroom at high vaulted ceiling. <br /> Schedule electrical final inspection when ready.3.Reschedule building final,when ready <br /> 2/1/2023 2/1/2023 BLDG 16-FINAL KURT KECK CORRECTION <br /> REQUIRED <br /> Notes: <br /> mulatush@gmail.com <br /> 206-697-9981 <br /> Obtain public works final <br /> 2/2/2023 2/2/2023 BLDG 16-FINAL RAKEEB KHAN CORRECTION <br /> REQUIRED <br /> Notes: <br /> Provide graspable handles for all closets.Secure bathroom toilet bars to withstand required load. Fix ramp to meet max slope of 8.3%. <br /> 2/7/2023 2/7/2023 BLDG 16-FINAL RAKEEB KHAN APPRVD-PERMIT <br /> FINAL <br /> Notes: <br /> mulatush@gmail.com <br /> 206-697-9981 <br /> Submit Delete Note <br /> Printed: Monday, 13 February,2023 2 of 2 ` 4 <br /> SUPERION <br />