Laserfiche WebLink
Washington State Energy Code Application <br /> BUSHNELL ENERGY <br /> CONSULTING <br /> Prepared by: Bushnell Energy Consulting <br /> 1 I <br /> RESNET Rater ID:3124142 <br /> 4 RESNET Provider: <br /> ,,., WSU Energy Program Provider ID:1998-100 <br /> Bikrampal Pannu Addition <br /> 2126-124th St. S.E. Everett, WA 98208 <br /> Heat Pump in existing house to supply heat for addition <br /> Heating output capacity 26,400 btuh See attached AHRI Certificate <br /> Heat load for existing house derived from WSU C3 Code Compliance calculator <br /> Heat load for addition derived from WSU Heat sizing Work sheet <br /> Existing Heat Pump has enough output capacity to supply heat for both existing and addition <br /> Addition 846 S.F. <br /> Table 406.2 &406.3 Required Energy credits 3.0 <br /> Fuel Normalization Credits Table R406.2 <br /> SYSTEM TYPE 2: 1.0 Energy Credits <br /> For an initial heating system using a heat pump <br /> that meets federal standards for the equipment <br /> listed in Table C403.3.2(1)C or C403.3.2(2) <br /> 00000000e000c0000000000000000e000000 <br /> Option 5.5 2.0 Energy Credits <br /> Electric heat pump water heater meeting the standards for Tier Ill of NEEA's advanced water heating <br /> specification. <br /> To qualify to claim this credit,the building permit drawings shall specify the option being selected and <br /> shall specify the water heater equipment type and the minimum equipment efficiency. <br /> 1407 S Ferdinand Dr, Tacoma, WA 98405 •253.549.5858 •www.bushnellenergyconsulting.com <br />