Laserfiche WebLink
1 E DEMOLITION PLAN NOTES • o • <br />2E 3E 4E 5E 6E 7E 8E 9E KAISER <br />1. OBTAIN DEMOLITION PERMITS AND INCLUDE ALL COSTS IN CONTRACT PRICE, IF \ PERMAI V E YTE,,, <br />REQUIRED. <br />Project <br />I 2. PROVIDE ALL LABOR AND MATERIALS/EQUIPMENT AS REQUIRED TO COMPLETE Kaiser Permanente Everett <br />DEMOLITION AND REMOVAL OF ALL ITEMS AS INDICATED. <br />3. PROVIDE STRICT CONTROL OF JOB CLEANING AND PREVENT DUST AND DEBRIS MOB Bac kf i <br />ll <br />FROM EMANATING FROM DEMOLITION / CONSTRUCTION AREA. KEEP AREA CLEAN. <br />I <br />4. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE 2929 PINE STREET <br />POINT IN QUESTION WITH THE ARCHITECT BEFORE PROCEEDING. EVERETT, WA 98201 <br />5. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE <br />LEFT IN "BROOM CLEAN" CONDITION. ALL DEBRIS AND MISCELLANEOUS MATERIAL Prepared for <br />SHALL BE REMOVED. KAISER FOUNDATION <br />6. DEBRIS REMOVAL SHALL BE PERFORMED USING THE BUILDING FREIGHT HEALTH PLAN, INC. <br />ELEVATOR. CONTACT THE BUILDING MGMT OFFICE TO OBTAIN SCHEDULE FOR <br />THE USE OF THE FREIGHT ELEVATORS PRIOR TO SUBMITTING BID. ALL DEBRIS <br />REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH BUILDING MANAGEMENT NATIONAL FACILITIES SERVICES <br />REQUIREMENTS AND PROCEDURES. POST OFFICE BOX 12916 <br />j 7. ALL MECHANICAL ITEMS, PLUMBING FIXTURES, LIGHT FIXTURES (INCLUDING OAKLAND, CA 94604 <br />DOWNLIGHTS & FLUORESCENTS) & SPECIAL EQUIPMENT SHOWN TO BE REMOVED. <br />SHALL BE CLEAN AND FREE OF DEFECTS, PROTECTED, SAVED AND RE -USED AS <br />DIRECTED HEREIN, RETURNED TO BUILDING STOCK OR DISPOSED OF AS <br />DIRECTED BY BLDG MGMT. <br />8. THE ELECTRICAL CONTRACTOR SHALL FURNISH A SYSTEM OF TEMPORARY LIGHT <br />& POWER IN THE SPACE DURING CONSTRUCTION. <br />I <br />9. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/ OR REPAIRING ANY <br />DAMAGE CAUSED BY HIM OR HIS SUBCONTRACTORS TO EXISTING <br />CONSTRUCTION IN ELEVATOR LOBBY, PUBLIC CORRIDORS, RESTROOMS OR <br />TENANT SPACES. REFINISH TO MATCH EXISTING ADJACENT FINISH, OR AS <br />NOTED HEREIN. <br />10. NO EXISTING SMOKE DETECTOR, PUBLIC ADDRESS SPEAKER, FIRE ALARM BOX <br />OR SIMILAR DEVICE, INCLUDING THE ASSOCIATED WIRING SHALL BE DAMAGED <br />DURING DEMOLITION AND SUBSEQUENT CONSTRUCTION. RELOCATION OF <br />SMOKE DETECTORS, PUBLIC ADDRESS SPEAKERS AND FIRE ALARM EQUIPMENT, <br />I I IF NECESSITATED BY NEW CONSTRUCTION, SHALL BE ACCOMPLISHED AS A <br />FIRST PRIORITY AND PER THE PLANS. NO ACTIVE SMOKE DETECTOR SHALL BE <br />COVERED OR OTHERWISE REMOVED OR USED FOR OTHER THAN IT'S INTENDED <br />PURPOSE. Hellmuth, Obata & Kassabaum, Inc. <br />1 11. REMOVE TO SOURCE ALL PIPES, VENTS, APPLIANCES OR DRAINS NOT BEING RE- 1218 Third Avenue, Suite 500 <br />j I USED. Seattle, WA 98101 USA <br />t +1 206 493 1771 f +1 206 493 1778 <br />12. RE -USE OR RELOCATE ALL ABOVE CEILING DUCTWORK, DIFFUSERS, GRILLES, <br />SPRINKLER PIPES OR OTHER EQUIPMENT, AS REQUIRED FOR PROPER <br />All reproduction & intellectual property rights reserved <br />� DISTRIBUTION WITH NEW LAYOUT. 2022 g <br />I <br />13. REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES AND CONDUIT PERTAINING In Association with <br />TO DATA/ COMMUNICATIONS AND TELEPHONE SHALL BE VERIFIED WITH <br />I F .; TELEPHONE COMPANIES SERVICE OWNER OR TENANT DATA/ COMMUNICATIONS Mortenson <br />o <br />I' "' REPRESENTATIVE AS REQUIRED TO PREVENT NEW CONSTRUCTION DELAYS. General Contractor <br />10230 NE Points Drive, Suite 300 <br />14. DEMOLITION IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON DRAWINGS. Kirkland, WA 98033 <br />THE INTENT IS TO INDICATE THE GENERAL SCOPE OF DEMOLITION REQUIRED TO <br />I COMPLETE THE WORK IN ACCORDANCE WITH THE CONTRACT DRAWINGS, <br />15. STAIRWAYS AND EXIT PATHS MUST REMAIN ACCESSIBLE AT ALL TIMES DURING <br />DEMOLITION. <br />(I <br />I 16. REMOVE EXISTING SIGNAGE/GRAPHICS AND STORE FOR RE -USE, WHERE <br />APPLICABLE. <br />I <br />I <br />it <br />Mazzetti <br />MEP + FP Engineering <br />�I 2013 4th Avenue, Suite 200 <br />I' II DEMOLITION LEGEND Seattle, WA 98121 <br />f Key Plan <br />I I EXISTING ROOM OR ZONE TO REMAIN, NOT <br />{ I I I INCLUDED IN THIS SCOPE OF WORK <br />EXISTING GYP BD PARTITION, DOOR, GLAZING <br />1 - _ AND FRAMES TO REMAIN <br />TI - - -�- --m-- EXISTING TO BE REMOVED/DEMO <br />II I E <br />I <br />i <br />I I j I i <br />_ 1 <br />I <br />— -- -- --- - = -- - = _ -_=_ --- ^-- --— -_ -_ -- DEMOLITION PLAN KEYNOTES <br />EXISTING TOILET, ALL FIXTURES AND ACCESSORIES TO REMAIN <br />� Professional Seals <br />D9 EXISTING WALL PHONE TO BE RELOCATED <br />\ D3 EXISTING COPPER PIPE TO REMAIN 4825 <br />_ _ - .- .�-_ _ - REGISTERED <br />\ / 11 (i \ / 1l r_. WALAB — I <br />-_ — <br />— — — --- — — — — — — — — — — — SC31 I D4 EXISTING FLOORING AND WALL BASE TO REMAIN ARCHITECT <br />- <br />II II { II I II II r II <br />__ f � -- I�------^—� I I f ' I — ------ ----- i I I SC40A I I <br />FITRM <br />---- --- <br />I I \ III { SG NC I I I �J / \ I _ I I i I D5 REMOVE EXISTING DOOR <br />�I J _-- { _ I{I ARR LL W TURNER <br />SCO C4A I I—_ -- \(� I ------ ------ ----- D12 L 0 STATE OFWASHINGTON <br />\� f — — — — — — — �\ o %I a t _ — I �� D6 DEMO PORTION OF WALL FOR NEW DOOR OPENING <br />11 <br />WRGEN \ / I D1 <br />1 <br />q I D8 D9 SC04 �\i I O-------------------------------------------- DEMO PORTION OF WALL FOR WALL OPENING <br />ID9 <br />D8 I o REMOVE SINK AND CAP PLUMBING LINE; TERMINATE &CAP <br />Eii <br />I j WASTG SGENL _ _ _ _ / \ / \ BOTH WATER SUPPLY LINE AND DRAIN LINE WHERE THEY <br />No. Description Date <br />\ � ENTER THE WALL OR THE FLOOR; SEE PLUMBING <br />SC03 \ SC04A I / n \ DRAWINGS FOR EXTENT OF DEMOLITION MOB BACK FILL ISSUED FOR PERMIT 2022/10/14 <br />i — — — \ — — — — — — — — — — —J I — — — —D10 O REMOVE CASEWORK AND SINK; TERMINATE & CAP BOTH <br />I I � I <br />— — — — WATER SUPPLY LINE AND DRAIN LINE WHERE THEY ENTER <br />�;.. <br />F I ,,j I I THE WALL OR THE FLOOR; SEE PLUMBING DRAWINGS FOR <br />D6 SCART ( I I I I OPROV I I DISPIL D12 I EXTENT OF DEMOLITION <br />SC03D I I I \ WRGEN � \ I SC32 � I SC40B j <br />1 <br />SEQGN I I SSTSU \71 <br />I D10 REMOVE FLOORING AND WALL BASE <br />SC003B I i I � — SC05 � � � SC04B EDGE OF FLOORING TO BE DEMOED <br />E _FRY <br />D12 — — I I D12 D10 D10 =� ` OirE� i i D12 REMOVE CASEWORK AND/OR FURNISHING <br />D10 I <br />I _ SGENL D11 <br />D13 REMOVE EXISTING FIRE EXTINGUSHER II I I D12 II I I � <br />SC03A i { I D10 <br />-------�I I 64" <br />o" <br />— — — —� — ----- <br />\ SGENL — ALIGN <br />II D12 II \ SCOOC2A r q { <br />D2 7III GENL II SGENL I SBUL�— — <br />03C SC03H SC03E — <br />i <br />r---I-i--- ----� — — I SLINC <br />I ----- --------I r--SC03 D10 III / / I S <br />� <br />I D12 D10 D10 <br />I D9rr <br />I \�I II I I <br />I I <br />I II II I I <br />_ - --- -- -- — — -- - --- —— I _ ]I I I I— <br />OGENL <br />,: <br />EXSLN <br />SC35 JT±= <br />F — jp­EXSLN S»v,C`1 L <br />SAG€N — <br />13 <br />-Scan-— — SG3 — — — - <br />1 sC01 I I I I I I I <br />�JI I WS EN \ <br />D8 _ I ;COF \ OGENL <br />D - _ <br />® 10 <br />t_ l I -H D10 SC06 T I T I I D10 <br />F <br />I D12 I I D10 I I I I I I I I I I I y\ <br />D12 I I I I I -L_- KIP Project No: CAP022566 <br />II — — — — — — — __ _ _ _ _ _ — — D9 I I I I D I I {, D9 \ HOK Project No: 22.05003.00 <br />— — — I F I I I I� \� . y. <br />----------- �I I � JI Sheet Title: <br />DEMO PLAN - LEVEL <br />P1 - AREA E <br />Q <br />M <br />0) <br />Original is 30 x 42- Do not scale contents of this drawing. <br />DEMO PLAN - LEVEL P1 - AREA E Sheet Number <br />N 1 N 1/4" = 1'-0" <br />0 <br />N B1 AD10P1 <br />