Q
<br />M
<br />O
<br />N
<br />0
<br />N
<br />N
<br />O
<br />N
<br />1E 2E 3E 4E 5E
<br />i
<br />I
<br />D12 i I \
<br />r -- --
<br />(D11 WK ST---- OS223E °S2 4t -
<br />____� S222
<br />o B D10 �
<br />I I D4
<br />c7
<br />----� Q
<br />I
<br />I
<br />--- WK STA �� CORRIDOR
<br />S221A j D4 S20005
<br />i
<br />D10 l
<br />II
<br />COPY / PRINT
<br />L-- S220 'f
<br />Ficp 0 F F-IC,E
<br />S-
<br />D4
<br />WK STA
<br />A
<br />I
<br />i
<br />I
<br />-
<br />OFFICE
<br />S218
<br />D4
<br />I ----� OFFICE
<br />S219 I I ,
<br />CORRIDOR
<br />t D12 i D10 i /S20OC4
<br />_—__J S2001-11
<br />---T ----- --1
<br />I I I
<br />I I D12 D4
<br />u----1--------- --
<br />i I `�
<br />OFFICE AUDIOLOGY BOO I
<br />II I S216 1 I 52;8
<br />u---- I
<br />OFFICE
<br />S217-
<br />I
<br />\ WAIT
<br />COPY/PRINTI I D4 S
<br />I S215
<br />)
<br />4
<br />--------- i fir''DE
<br />,3 IIP211
<br />DIVE STOR
<br />D12 itD12 i I D12 itDS212I
<br />SEC
<br />E;]� D11 _"Ji
<br />D4 ;;ORRIDOR
<br />S200C3
<br />EI_EV I
<br />���vE4
<br />C a ---
<br />uti(�I�D
<br />S20OC2
<br />L�
<br />I
<br />r
<br />CORRIDOR
<br />S200C1
<br />IT ! VEND
<br />S2{.6A
<br />LAB
<br />S236
<br />WK STA
<br />S235 -
<br />EXAM,,;
<br />S26G
<br />EXAM
<br />S261
<br />7E 8E 9E
<br />.m
<br />ir
<br />t +N e............ _.. r
<br />},
<br />3 !
<br />i
<br />I I '
<br />r
<br />1=, ICE 3
<br />---- S0 -- OrF=CE OFFICE
<br />S231 I ( S254
<br />e
<br />i
<br />I
<br />I I I
<br />I II I
<br />I j II
<br />VVK STA 'YK STA WK STr".
<br />S229E S229G S2291 S253
<br />tEXPO
<br />�- WK STA �; WK S I A 3229 i C_FFCE
<br />S229 S229H 253
<br />I I I
<br />I I I
<br />o
<br />"::-01-?RIDOR
<br />S20006
<br />T II_ET
<br />g 523.E
<br />l
<br />1 ;
<br />S252
<br />M
<br />I I
<br />I
<br />WK STA
<br />•. S275L' I
<br />SiOR
<br />CORRIDOR
<br />S20O(D'9
<br />Li.bbY
<br />S260A
<br />DEMO PLAN LEVEL 2 - AREA E
<br />1/4" = 1'-0"
<br />CORRIDOR
<br />_'00C1 A
<br />77FI -,
<br />S200CJA
<br />EOELC,
<br />EXIS
<br />ELEC
<br />S2�OOCw;
<br />I
<br />of
<br />•
<br />DEMOLITION PLAN NOTES
<br />1 KAISER
<br />PERMANENTE.�
<br />1.
<br />OBTAIN DEMOLITION PERMITS AND INCLUDE ALL COSTS IN CONTRACT PRICE, IF
<br />-�
<br />REQUIRED.
<br />Project
<br />2.
<br />PROVIDE ALL LABOR AND MATERIALS/EQUIPMENT AS REQUIRED TO COMPLETE
<br />Kaiser Permanente Everett
<br />DEMOLITION AND REMOVAL OF ALL ITEMS AS INDICATED.
<br />MOB Backfill
<br />3.
<br />PROVIDE STRICT CONTROL OF JOB CLEANING AND PREVENT DUST AND DEBRIS
<br />FROM EMANATING FROM DEMOLITION / CONSTRUCTION AREA, KEEP AREA CLEAN.
<br />2929 PINE STREET
<br />4.
<br />IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE
<br />EVERETT, WA 98201
<br />POINT IN QUESTION WITH THE ARCHITECT BEFORE PROCEEDING.
<br />5.
<br />AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE
<br />Prepared for
<br />LEFT IN "BROOM CLEAN" CONDITION. ALL DEBRIS AND MISCELLANEOUS MATERIAL
<br />p
<br />SHALL BE REMOVED.
<br />KAISER FOUNDATION
<br />6.
<br />DEBRIS REMOVAL SHALL BE PERFORMED USING THE BUILDING FREIGHT
<br />HEALTH PLAN, INC.
<br />ELEVATOR. CONTACT THE BUILDING MGMT OFFICE TO OBTAIN SCHEDULE FOR
<br />THE USE OF THE FREIGHT ELEVATORS PRIOR TO SUBMITTING BID, ALL DEBRIS
<br />NATIONAL FACILITIES SERVICES
<br />REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH BUILDING MANAGEMENT
<br />REQUIREMENTS AND PROCEDURES.
<br />POST OFFICE BOX 12916
<br />OAKLAND, CA 94604
<br />7.
<br />ALL MECHANICAL ITEMS. PLUMBING FIXTURES, LIGHT FIXTURES (INCLUDING
<br />DOWNLIGHTS & FLUORESCENTS) & SPECIAL EQUIPMENT SHOWN TO BE REMOVED,
<br />SHALL BE CLEAN AND FREE OF DEFECTS, PROTECTED, SAVED AND RE -USED AS
<br />DIRECTED HEREIN, RETURNED TO BUILDING STOCK OR DISPOSED OF AS
<br />DIRECTED BY BLDG MGMT.
<br />&
<br />THE ELECTRICAL CONTRACTOR SHALL FURNISH A SYSTEM OF TEMPORARY LIGHT
<br />& POWER IN THE SPACE DURING CONSTRUCTION.
<br />9.
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/ OR REPAIRING ANY
<br />DAMAGE CAUSED BY HIM OR HIS SUBCONTRACTORS TO EXISTING
<br />CONSTRUCTION IN ELEVATOR LOBBY, PUBLIC CORRIDORS, RESTROOMS OR
<br />TENANT SPACES. REFINISH TO MATCH EXISTING ADJACENT FINISH, OR AS
<br />NOTED HEREIN.
<br />•
<br />10.
<br />NO EXISTING SMOKE DETECTOR, PUBLIC ADDRESS SPEAKER, FIRE ALARM BOX
<br />OR SIMILAR DEVICE, INCLUDING THE ASSOCIATED WIRING SHALL BE DAMAGED
<br />DURING DEMOLITION AND SUBSEQUENT CONSTRUCTION. RELOCATION OF
<br />SMOKE DETECTORS. PUBLIC ADDRESS SPEAKERS AND FIRE ALARM EQUIPMENT,
<br />IF NECESSITATED BY NEW CONSTRUCTION, SHALL BE ACCOMPLISHED AS A
<br />FIRST PRIORITY AND PER THE PLANS. NO ACTIVE SMOKE DETECTOR SHALL BE
<br />COVERED OR OTHERWISE REMOVED OR USED FOR OTHER THAN IT'S INTENDED
<br />PURPOSE.
<br />Hellmuth, Obata & Kassabaum, Inc.
<br />1218 Third Avenue, Suite 500
<br />11.
<br />REMOVE TO SOURCE ALL PIPES, VENTS, APPLIANCES OR DRAINS NOT BEING RE-
<br />Seattle, WA 98101 USA
<br />USED.
<br />t +1 206 493 1771 f +1 206 493 1778
<br />12.
<br />RE -USE OR RELOCATE ALL ABOVE CEILING DUCTWORK, DIFFUSERS, GRILLES,
<br />SPRINKLER PIPES OR OTHER EQUIPMENT, AS REQUIRED FOR PROPER
<br />All reproduction & intellectual property rights reserved
<br />DISTRIBUTION WITH NEW LAYOUT.
<br />2022
<br />In Association with
<br />13.
<br />REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES AND CONDUIT PERTAINING
<br />TO DATA/ COMMUNICATIONS AND TELEPHONE SHALL BE VERIFIED WITH
<br />Mortenson
<br />TELEPHONE COMPANIES SERVICE OWNER OR TENANT DATA/ COMMUNICATIONS
<br />General Contractor
<br />REPRESENTATIVE AS REQUIRED TO PREVENT NEW CONSTRUCTION DELAYS.
<br />10230 NE Points Drive, Suite 300
<br />14.
<br />DEMOLITION IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON DRAWINGS.
<br />Kirkland, WA 98033
<br />THE INTENT IS TO INDICATE THE GENERAL SCOPE OF DEMOLITION REQUIRED TO
<br />COMPLETE THE WORK IN ACCORDANCE WITH THE CONTRACT DRAWINGS.
<br />15.
<br />STAIRWAYS AND EXIT PATHS MUST REMAIN ACCESSIBLE AT ALL TIMES DURING
<br />DEMOLITION.
<br />16.
<br />REMOVE EXISTING SIGNAGE/GRAPHICS AND STORE FOR RE -USE, WHERE
<br />APPLICABLE.
<br />DEMOLITION LEGEND
<br />EXISTING ROOM OR ZONE TO REMAIN, NOT
<br />INCLUDED IN THIS SCOPE OF WORK
<br />EXISTING GYP BD PARTITION, DOOR, GLAZING
<br />AND FRAMES TO REMAIN
<br />EXISTING TO BE REMOVED/DEMO
<br />DEMOLITION PLAN KEYNOTES
<br />D1 EXISTING TOILET, ALL FIXTURES AND ACCESSORIES TO
<br />REMAIN
<br />D2 EXISTING WALL PHONE TO BE RELOCATED
<br />D3 EXISTING COPPER PIPE TO REMAIN
<br />D4 EXISTING FLOORING AND WALL BASE TO REMAIN
<br />D5 REMOVE EXISTING DOOR
<br />D6 DEMO PORTION OF WALL FOR NEW DOOR OPENING
<br />D7 DEMO PORTION OF WALL FOR WALL OPENING
<br />pg REMOVE SINK AND CAP PLUMBING LINE; TERMINATE & CAP
<br />BOTH WATER SUPPLY LINE AND DRAIN LINE WHERE THEY
<br />ENTER THE WALL OR THE FLOOR; SEE PLUMBING
<br />DRAWINGS FOR EXTENT OF DEMOLITION
<br />pg REMOVE CASEWORK AND SINK; TERMINATE & CAP BOTH
<br />WATER SUPPLY LINE AND DRAIN LINE WHERE THEY ENTER
<br />THE WALL OR THE FLOOR; SEE PLUMBING DRAWINGS FOR
<br />EXTENT OF DEMOLITION
<br />D10 REMOVE FLOORING AND WALL BASE
<br />D11 EDGE OF FLOORING TO BE DEMOED
<br />D12 REMOVE CASEWORK AND/OR FURNISHING
<br />D13 REMOVE EXISTING FIRE EXTINGUSHER
<br />Mazzetti
<br />MEP + FP Engineering
<br />2013 4th Avenue, Suite 200
<br />Seattle, WA 98121
<br />Key Plan
<br />�l
<br />Professional Seals
<br />4825
<br />REGISTERED
<br />ARCHITECT
<br />ARR LL W TURNER
<br />STATE OF WASHINGTON
<br />No. Description Date
<br />MOB BACK FILL ISSUED PERMIT 20 10 14
<br />KIP Project No: CAP022566
<br />HOK Project No: 22.05003.00
<br />Sheet Title:
<br />DEMO PLAN - LEVEL 2
<br />- AREA E
<br />Original is 30 x 42. Do not scale contents of this drawing.