Laserfiche WebLink
HVAC CONSTRUCTION NOTES <br />11 WALL HUNG DUCTLESS FAN COIL UNIT. MOUNT <br />ON WALL BELOW TEAR CEILING. FLD COORDINATE <br />EXACT MOUNTING HEIGHT. <br />OZ OUTDOOR HEAT PUMP UNIT. MOUNT ON WALL AT <br />THIS APPROXIMATE LOCATION. FLD COORDINATE <br />EXACT MOUNTING HEIGHT. <br />(8)REFRIGERANT PIPING. J" LIQUID LINE, g" SUCTION <br />LINE. <br />04 ERV (BOAS) UNIT. HANG ABOVE CEILING AT THIS <br />APPROXIMATE LOCATION WITH NEOPRENE <br />ISOLATORS. FLD DETAIL. <br />05 OSA DUCT THROUGH UPPER EXTERIOR WALL TO <br />EYEBROW TERMINATION. INSTALL BOB / CLASS I <br />MOTORIZED SHUT-OFF DAMPER AT WALL <br />PENETRATION AS INDICATED. <br />©EXHAUST DUCT UP TO NEW ROOFTOP GLOBE <br />VENT TERMINATION. INSTALL ROD / CLASS I <br />MOTORIZED SHUT-OFF DAMPER AT WALL <br />PENETRATION AS INDICATED. <br />O7 EYEBROW VENT TERMINATIONS FOR ERV UNIT <br />BELOW ROOF OVERHANG. <br />©DASHED LINE INDICATES EXTERIOR WALL ABOVE. <br />OREFRIGERANT PIPING. J" LIQUID LINE, J" SUCTION <br />LINE. <br />10 SEPARATED COMBUSTION GAS FIRED UNIT <br />HEATER. HANG IN THIS APPROXIMATE LOCATION. <br />FLD COORDINATE EXACT MOUNTING HEIGHT. <br />11 4"0 COMBUSTION AIR AND FLUE VENT PIPING UP <br />TO FACTORY CONCENTRIC TERMINATION. <br />12 FACTORY CONCENTRIC COMBUSTION AIR / VENT <br />PIPE TERMINATION. INSTALL PER MANUFACTURERS <br />INSTRUCTIONS. FLD DETAIL. <br />13 DOOR SENSOR. SENSOR TO LOCK OUT UH-1 <br />AND UH-2 IF DOOR REMAINS OPEN FOR MORE <br />THEN 5 MINUTES. <br />14 NEW LOW PRESSURE GAS METER. PROVIDED AND <br />INSTALLED BY OTHERS. MINIMUM METER OUTPUT <br />FOR HVAC 90 MBH. <br />15 SCHEDULE 40 NATURAL GAS PIPING. RUN AS <br />HIGH AS POSSIBLE. REVIEW GAS LINE SIZES IF <br />PIPING EXCEEDS 125' FROM METER TO <br />FURTHEST UNIT. <br />�,,iROOF 1' PLAN - HVAC <br />-0" <br />RETAIL SALES SYSTEM zae-s6a)eaa <br />HP-1 <br />2-2-/coln <br />CONFERENCE SYSTEM <br />M NSE <br />— — <br />STAFF SYSTEM /�xz <br />N/A PUZ-A36NHA7 <br />N/A PUZ-M6NHA7 <br />J�'MSZ� <br />-A36KA7.TH LCH-P600Rvx2-E <br />I HP -I PIPING/ WIRING DIAGRAM <br />FNA-A66NA7.THLOH-F4101N%2-E <br />q4� <br />HP-2 PIPING �E WIRING DIAGRAM <br />001 � <br />2 <br />A- <br />HP-3 PIPING WIRING DIAGRAM <br />UNITED I <br />SYSTEMS <br />M E C H A N I CAL L L C <br />A FULL SERVICE CCAM ERCIAL <br />HVAC CONTRACTOR <br />1400 AIRPORT WAY SOUTH <br />SUITE 202 <br />SEATTLE, WASHINGTON 98134 <br />(206)933-6036/FAX 937-3084 <br />�GI S7TERE➢ ��� <br />�SSIONAL ENVl <br />EXPIRES 05-09-2023 <br />10-25-22 <br />REVISIONS <br />DATE DISCRIPTION <br />J <br />I <br />W <br />H <br />W <br />Z <br />z <br />wo <br />W <br />zQ� <br />U <br />g}z a <br />Z <br />o <br />O <br />` <br />/ <br />O <br />0 � <br />J m <br />Li <br />L <br />r <br />CC O <br />//1 <br />Q N W 03 <br />> 'o > CO <br />V! <br />(O W <br />_ CO <br />FILE NAME <br />:SVDP—M <br />PROJECT ENGINEER <br />:,JGL <br />DATE REVISED <br />:10-25-2022 <br />JOB NUMBER <br />:982j <br />SHEET NUMBER <br />M-3 <br />THESE DRAWINGS ARE THE PROPERTY OF UNITED SYSTEMS MECHANICAL LLC AND MUST NOT BE REPRODUCED, ALTERED OR USED WITHOUT THE PRIOR WRITTEN AUTHORITY OF UNITED SYSTEMS LLC. THESE DRAWINGS ARE TO BE USED ONLY AS SUPPLEMENTARY TO THE ARCHITECT'S DRAWINGS AND SPECIFICATIONS. ANY PROPOSED VARIATIONS OR DEPARTURES FROM THESE DRAWINGS MUST BE APPROVED BY UNITED SYSTEMS MECHANICAL LLC. <br />