My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialized Pavement Marking LLC 6/27/2023
>
Contracts
>
Small Works Roster Contracts and Change Orders
>
Small Works Roster Contracts and Change Orders
>
Specialized Pavement Marking LLC 6/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2023 1:42:56 PM
Creation date
7/7/2023 1:42:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialized Pavement Marking LLC
Approval Date
6/27/2023
Department
Public Works
Department Project Manager
Corey Hert
Subject / Project Title
2023 Citywide Pavement Markings
Public Works WO Number
2023-028
Tracking Number
0003815
Total Compensation
$211,994.00
Contract Type
Small Works Roster Contracts and Change Orders
Contract Subtype
Small Works Roster Contracts and Change Orders
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`. WASHINGTON EVERETT CITY OF EVERETT, WASHINGTON <br /> CONTRACT <br /> THIS CONTRACT is made and entered into this 15th day of May , 2023 , by and between the <br /> City of Everett, a Washington municipal corporation (the "City"), and Specialized Pavement Markir( hbLC <br /> "Contractor"). <br /> In consideration of the sums to be paid to it by the City, the Contractor hereby covenants and agrees to <br /> furnish all labor, tools, materials, equipment, and supplies required to build and construct in <br /> accordance with the Contract Documents the work, improvements, and appurtenances set forth in the <br /> Invitation to Quote entitled: <br /> 2023 CITYWIDE PAVEMENT MARKINGS <br /> The entire work, improvements, and appurtenances set forth in such Invitation to Quote is referred to <br /> herein as either the "Work" or the "Project." <br /> 1. Contract Documents. The following documents ("Contract Documents") are <br /> incorporated by reference and are hereby made a part of this Contract: <br /> A. This Contract document. <br /> B. Invitation for Quote and addenda thereto, including without limitation <br /> Instructions, General Conditions, Specifications, Contractor Commitment and Information, Price Sheet, <br /> Certification of Compliance, Minority Business Certification, Contractor References, and any other <br /> document included in the Invitation to Quote. <br /> C. Change Orders (if any) <br /> D. All provisions required by law. <br /> A purchase order issued as a Notice to Proceed is only a Contract Document as a Notice to Proceed. <br /> Such purchase order's pre-printed terms and conditions are not part of the Contract. <br /> If there is any inconsistency in the parts of the Contract Documents, then the most stringent on the <br /> Contractor applies, unless the City's authorized representative determines otherwise in writing. The <br /> Work required in one part must be furnished even if not mentioned in other parts of the Contract. <br /> These parts complement each other in describing the complete Work. Any requirement in one part <br /> binds as if stated in all parts.The Contractor shall provide any work or materials clearly implied in the <br /> Contract even if the Contract does not mention it specifically. <br /> 2. Contract Time. The Work shall be physically complete in all respects within seventy-five <br /> (75) calendar days from the date of issuance of the Notice to Proceed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.