My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2029 COLBY AVE 2023-07-12
>
Address Records
>
COLBY AVE
>
2029
>
2029 COLBY AVE 2023-07-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 9:47:30 AM
Creation date
7/12/2023 9:31:01 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2029
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: P2208-034 <br />Applied: 8/24/2022 <br />Issued: 8/30/2022 <br />Status: FINALED <br />Parent Permit: B2205-091 <br />Parent Project: <br />Permit Inspections <br />City of Everett <br />Approved:8/24/2022 <br />Finaled: 6/8/2023 <br />Details: <br />re -pipe of currently plumbing to code <br />re -plumb bathroom and kitchen <br />Description: re -plumb bathroom and kitchen <br />Site Address: 2029 COLBY AVE <br />City, State Zip Code: EVERETT, WA <br />Applicant: Sean Burnell <br />Owner: PETER JOYCE LYNN <br />Contractor: GOLDEN COAST CNST/RST/NW INC <br />11 <br />SCHEDULED DATE <br />COMPLETED DATE TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />2/10/2023 <br />2/10/2023 PLUMB 03-ROUGH <br />JASON <br />CORRECTION <br />see notes <br />IN <br />MORRISSEY <br />REQUIRED <br />Notes: <br />DALLAS SMITH 425-530-6054 <br />W ESTCOASTP M @ CO M CAST. N ET <br />- Cross sectional vent area through roof is inadequate per chap 9 UPC.- No water test on waste per chapter 7.- To many changes of direction on 3" trap <br />arm and drain for toilet.- Install proper building cleanout on exterior.- Install cleanout on lav drain over five feet per chap 7.- Finish plumbing system. <br />3/8/2023 <br />3/8/2023 <br />PLUMB 03-ROUGH <br />JASON <br />CORRECTION <br />see notes <br />IN <br />MORRISSEY <br />REQUIRED <br />Notes: <br />DALLAS SMITH 425-530-6054 <br />W ESTCOASTP M @ CO M CAST. N ET <br />- Roll dry vents above the centerline of the drain (shower and toilet) per the UPC 905.2 Horizontal Drainage Pipe 905.3 Vent Pipe Rise Where vents <br />connect to a horizontal drainage pipe, each vent pipe shall have its invert taken off above the drainage centerline of such pipe downstream of the trap <br />being served. Toilet vent needs to take off from horizontal drain downstream of closet bend. Ok to run toilet with 2" vent.- 3" clean -outs require 18" of <br />front clearance per the UPC 707.9 Clearance- Move water lines for kitchen sink and AW to inside of wall to prevent freezing per the UPC 312.6 Freezing <br />Protection <br />3/10/2023 <br />3/10/2023 <br />PLUMB 03-ROUGH <br />JASON <br />APPROVAL <br />see notes <br />IN <br />MORRISSEY <br />Notes: <br />- Rough DWV and water ok for bathroom, AW and kitchen. <br />5/9/2023 <br />5/9/2023 <br />PLUMB 06A-SHOWER <br />JEFF M RHODE <br />APPROVAL <br />see notes <br />Notes: <br />6/6/2023 <br />6/6/2023 <br />PLUMB 08-FINAL <br />JEFF M RHODE <br />CORRECTION <br />see notes <br />REQUIRED <br />Notes: <br />DALLAS SMITH 425-530-6054 <br />W ESTCOASTP M @ CO M CAST. N ET <br />I <br />Printed: Thursday, 08 June, 2023 1 of 2 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.