My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1313 75TH ST SW 2023-07-12
>
Address Records
>
75TH ST SW
>
1313
>
1313 75TH ST SW 2023-07-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 6:22:40 AM
Creation date
7/13/2023 10:48:19 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1313
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2303-081 Description:Add 2000A feeder to SWBD and wire wi/4 xfrm and <br /> rectifier <br /> Applied:3/9/2023 Approved: 3/9/2023 Site Address: 1313 75TH ST SW <br /> Issued:3/23/2023 Finaled: 7/12/2023 City,State Zip Code: EVERETT,WA 98203 <br /> Status: FINALED Applicant: R&S ELECTRIC <br /> Parent Permit: Owner: MIDDLE EARTH HOLDING LLC <br /> Parent Project: Contractor: R&S ELECTRIC <br /> Details: <br /> Includes new feeder,switchboard,disconnects,wiring,and connections <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 6/1/2023 6/1/2023 ELEC 10-FINAL MICHAEL CORRECTION as noted <br /> WICKLANDER REQUIRED <br /> Notes: <br /> 5/31/2023 1:03 PM R&S ELECTRIC <br /> Contact Name:R&S ELECTRIC <br /> Site Address:1313 75TH ST SW <br /> Phone:3606591361 <br /> e-Mail:ddimascio@r-selectric.com <br /> Corner ground of delta transformers are required.WYE transformers are bonded correctly at xo. <br /> 7/11/20237/11/2023 ELEC 10-FINAL MICHAEL APPRVD-PERMIT eTRAKiT Inspection Request <br /> WICKLANDER FINAL <br /> Notes: <br /> 7/10/2023 7:54 AM R&S ELECTRIC <br /> Contact Name:R&S ELECTRIC <br /> Site Address:1313 75TH ST SW <br /> Phone:3606591361 <br /> e-Mail:ddimascio@r-selectric.com <br /> Approved final on phase 1 rectifier base and 4)600 amp disconnects <br /> approve phase 1 rectifier feeders and 4)600 amp disconnects <br /> I <br /> Printed:Wednesday, 12 July, 2023 1 of 1 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.