Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2303-150 Description: (2)CIRCUITS-ROOFTOP SOLAR INSTALLATION <br /> Applied:3/17/2023 Approved: 3/23/2023 Site Address: 2323 ROCKEFELLER AVE <br /> Issued:3/23/2023 Finaled: 7/5/2023 City,State Zip Code: EVERETT,WA 98201 <br /> Status: FINALED Applicant:SOLGEN POWER(ELEC)LLC <br /> Parent Permit: B2303-062 Owner: PETERSON MICHAEL J&ALLEN STORMY D <br /> Parent Project: Contractor:SOLGEN POWER(ELEC)LLC <br /> Details: <br /> PV Solar Roof Mount Installation,2 circuits,6.48 kW <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> ELEC 10-FINAL ELEC INSPECTOR eTRAKiT Inspection Request <br /> Notes: <br /> 5/16/2023 8:39 AM SOLGEN POWER(ELEC)LLC <br /> AM preferred.Please contact the customer prior to arrival. <br /> Contact Name:Michael Allen Peterson <br /> Site Address:2323 ROCKEFELLER AVE <br /> Phone:4253503796 <br /> e-Mail:inspection@SOLGENPOWER.COM <br /> ELEC 10-FINAL ELEC INSPECTOR eTRAKiT Inspection Request <br /> Notes: <br /> 6/27/2023 11:35 AM SOLGEN POWER(ELEC)LLC <br /> PM inspection preferred. <br /> Contact Name:Michael Allen Peterson <br /> Site Address:2323 ROCKEFELLER AVE <br /> Phone:4253503796 <br /> e-Mail:inspections@SOLGENPOWER.COM <br /> 5/1/2023 5/1/2023 ELEC 10-FINAL MICHAEL CORRECTION eTRAKiT Inspection Request <br /> WICKLANDER REQUIRED <br /> Notes: <br /> 4/25/2023 11:25 AM SOLGEN POWER(ELEC)LLC <br /> CUSTOMER WILL BE HOME,PREFERS PM INSPECTION.PLEASE CONTACT THE CUSTOMER PRIOR TO ARRIVAL.THANK YOU FOR YOUR TIME AND <br /> PATIENCE. <br /> Contact Name:MICAHEL ALLEN PETERSON <br /> Site Address:2323 ROCKEFELLER AVE <br /> Phone:4253503796 <br /> e-Mail:PERMITTING@SOLGENPOWER.COM <br /> Flexible,metal conduit is not rated for unfused conductor use. Both neutral bonds need to be connected together. <br /> I <br /> Printed:Wednesday,05 July, 2023 1 of 2 <br /> SUPERION <br />