Laserfiche WebLink
VERETT <br />0 <br />Permit Number: P2301-031 <br />Applied: 1/25/2023 <br />Issued:1/25/2023 <br />Status: FINALED <br />Parent Permit: <br />Parent Project: <br />Details <br />Permit Inspections <br />City of Everett <br />Approved:1/25/2023 <br />Finaled: 4/25/2023 <br />Description: RELOCATE TUB & SHOWER DRAIN <br />Site Address: 590125TH AVE W <br />City, State Zip Code: EVERETT, WA 98203 <br />Applicant: STEVEN M CHUN <br />Owner: CHUN JULIE & STEVEN <br />Contractor: OWNER <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />1/30/2023 <br />1/30/2023 <br />PLUMB 03-ROUGH <br />JASON <br />CORRECTION <br />see notes <br />IN <br />MORRISSEY <br />REQUIRED <br />Notes: <br />1/25/2023 7:11 PM Eliahu Turgeman <br />Morning inspection if possible please <br />Contact Name: Eliahu Turgeman <br />Site Address: 5901 25TH AVE W <br />Phone:3238991456 <br />e-Mail: elinrg@yahoo.com <br />jjm changed Inspection Type from PLUMB 08-FINAL to PLUMB 03-ROUGH IN <br />- Rotate electronic mixing valves to face into bedroom through access panels for future servicing. <br />2/6/2023 <br />2/6/2023 <br />PLUMB 03-ROUGH <br />JASON <br />APPROVAL <br />see notes <br />IN <br />MORRISSEY <br />Notes: <br />Phone:3238991456 <br />e-Mail: elinrg@yahoo.com <br />- Rough plumbing ok.*** Make sure to call in for shower pan test.*** Make sure to pull an electrical permit before any electrical work is done. <br />4/19/2023 <br />4/19/2023 <br />PLUMB 08-FINAL <br />JASON <br />APPRVD-PERMIT <br />MORRISSEY <br />FINAL <br />Notes: <br />333-899-1456 <br />ELINRG@YAHOO.COM <br />I <br />Printed: Thursday, 27 April, 2023 1 of 1 rk <br />SUPERION <br />