My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ballard Marine Construction 7/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Ballard Marine Construction 7/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2023 3:16:07 PM
Creation date
7/18/2023 3:15:37 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ballard Marine Construction
Approval Date
7/14/2023
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Emergency Column Repair Reservior 3
Tracking Number
0003827
Total Compensation
$77,299.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />CONTRACT <br />(EMERGENCY PROCUREMENT/NO BOND REQUIRED) <br />THIS CONTRACT is dated as of the date of last signature below and is by and between the City of <br />Everett, a Washington municipal corporation (the “City”), and the Contractor shown below in the Basic <br />Provisions. This Contract is made pursuant to an emergency under RCW 39.04.280 <br />1.Basic Provisions: <br />Contractor <br />Ballard Marine Construction <br />727 S 27th St <br />Washougal, WA 98671 <br />jon.hardt@ballardmc.com <br />City Project <br />Manager <br />John Nottingham, P.E. <br />3200 Cedar Street <br />Everett, WA 98201 <br />jnottingham@everettwa.gov <br />Contract Time <br />The fabrication Work shall be completed within 30 working days after the <br />notice to proceed. The installation Work and all other Work shall be <br />completed within 5 working days after completion of fabrication. <br />Contract Price <br />The Contract Price is $77,929.25, which is the sum of $5,531.80 (for <br />measurement verification), $26,527.05 (for materials and fabrication) and <br />$45,870.40 (underwater installation work). The $45,870.40 is a not-to-exceed <br />based in part on estimated hours for five days at the rates quoted to the City <br />on July 13, 2023. If actual hours are less than as estimated, the $45,870 will be <br />adjusted downward. <br />Contract <br />Documents <br />The following documents (“Contract Documents”) are incorporated by reference and are hereby made a part of this Contract: this Contract document, the general conditions, change orders, all provisions required by law, and <br />Drawings and Calculations of Peterson Structural Engineers dated 7.6.23
The URL can be used to link to this page
Your browser does not support the video tag.