Laserfiche WebLink
1 <br />CONTRACT <br />(EMERGENCY PROCUREMENT/NO BOND REQUIRED) <br />THIS CONTRACT is dated as of the date of last signature below and is by and between the City of <br />Everett, a Washington municipal corporation (the “City”), and the Contractor shown below in the Basic <br />Provisions. This Contract is made pursuant to an emergency under RCW 39.04.280 <br />1.Basic Provisions: <br />Contractor <br />Ballard Marine Construction <br />727 S 27th St <br />Washougal, WA 98671 <br />jon.hardt@ballardmc.com <br />City Project <br />Manager <br />John Nottingham, P.E. <br />3200 Cedar Street <br />Everett, WA 98201 <br />jnottingham@everettwa.gov <br />Contract Time <br />The fabrication Work shall be completed within 30 working days after the <br />notice to proceed. The installation Work and all other Work shall be <br />completed within 5 working days after completion of fabrication. <br />Contract Price <br />The Contract Price is $77,929.25, which is the sum of $5,531.80 (for <br />measurement verification), $26,527.05 (for materials and fabrication) and <br />$45,870.40 (underwater installation work). The $45,870.40 is a not-to-exceed <br />based in part on estimated hours for five days at the rates quoted to the City <br />on July 13, 2023. If actual hours are less than as estimated, the $45,870 will be <br />adjusted downward. <br />Contract <br />Documents <br />The following documents (“Contract Documents”) are incorporated by reference and are hereby made a part of this Contract: this Contract document, the general conditions, change orders, all provisions required by law, and <br />Drawings and Calculations of Peterson Structural Engineers dated 7.6.23