My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ballard Marine Construction 7/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Ballard Marine Construction 7/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2023 3:16:07 PM
Creation date
7/18/2023 3:15:37 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ballard Marine Construction
Approval Date
7/14/2023
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Emergency Column Repair Reservior 3
Tracking Number
0003827
Total Compensation
$77,299.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />9. Waiver of Industrial Insurance Immunity. Contractor waives any right of contribution <br />against the City. It is agreed and mutually negotiated that in any and all claims against the City, its <br />agents or employees, the Contractor, a subcontractor, anyone directly or indirectly employed by the <br />Contractor or subcontractor, or anyone for whose acts any of them may be liable, the defense and <br />indemnification obligations hereunder shall not be limited in any way by any limitation on the amount <br />of damages, compensation, or benefits payable by or for the Contractor or any subcontractor under <br />industrial worker’s compensation acts, disability benefit acts, or other employees’ benefit acts. <br />Solely for the purpose of indemnification and defense as provided in this Contract, the Contractor <br />specifically waives any immunity under the State Industrial Insurance Law, Title 51 RCW. The <br />Contractor expressly acknowledges that this waiver of immunity under Title 51 RCW was the subject of <br />mutual negotiation and was specifically entered into pursuant to the provisions of RCW 4.24.115. <br /> <br />10. Repair of Damage. The Contractor agrees to repair and replace all property of the <br />City and all property of others damaged by it, its employees, subcontractors, suppliers, and agents. <br /> <br />11. Pre-Contract Inspection and Risk of Loss. It is understood that the whole of the work <br />under this Contract is to be done at the Contractor’s risk and that: (1) prior to executing this Contract, <br />it became familiar with the conditions of excavation, subsurface, backfill, materials, climatic conditions, <br />location, traffic, and other contingencies that may affect the work and (2) that it assumes the <br />responsibility and risk of all loss or damage to materials or work which may arise from any cause <br />whatsoever prior to completion. <br /> <br />12. Headings for Convenience Only. The headings in this document are for convenience only <br />and shall not be used or considered to interpret or construe this document. <br /> <br />13. Effective Date. This Contract is the This Contract is effective as of the date of the last <br />person to sign it and may be executed in multiple counterparts, each of which shall be deemed an <br />original. Any ink, electronic, faxed, scanned, photocopied, or similarly reproduced signature on this <br />Agreement or any amendment hereto will be deemed an original signature and will be fully <br />enforceable as an original signature. <br /> <br />[Remainder of Page Intentionally Left Blank; Signature Page Follows]
The URL can be used to link to this page
Your browser does not support the video tag.