My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2402 56TH ST SW 2023-11-01
>
Address Records
>
56TH ST SW
>
2402
>
2402 56TH ST SW 2023-11-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 9:51:25 AM
Creation date
7/20/2023 7:26:55 AM
Metadata
Fields
Template:
Address Document
Street Name
56TH ST SW
Street Number
2402
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: P2306-016 <br />Applied: 6/8/2023 <br />Issued: 6/8/2023 <br />Status: FINALED <br />Parent Permit: B2306-021 <br />Parent Project: <br />Details <br />Permit Inspections <br />City of Everett <br />Approved:6/8/2023 <br />Finaled: 7/13/2023 <br />Description: PLUMBING FOR BATHROOM REMODEL -SHOWER, TUB, (2) <br />SINKS, TOILET <br />Site Address: 2402 56TH ST SW <br />City, State Zip Code: EVERETT, WA 98203 <br />Applicant: LINDA GABOUREL <br />Owner: LINDA GABOUREL <br />Contractor: BULUGHNSON PLUMBING LLC <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />6/13/2023 <br />6/13/2023 <br />PLUMB 01- <br />JEFF M RHODE <br />CORRECTION <br />see notes <br />CONSULTATION <br />REQUIRED <br />Notes: <br />LINDA <br />(425)870-7605 <br />JOEBATES100@MSN.COM <br />Expose all unapproved work (including electrical, mechanical, plumbing, and framing systems etc.) installed/altered without permits and inspection <br />approval. <br />6/26/2023 <br />6/26/2023 <br />PLUMB 03i-ROUGH <br />JEFF M RHODE <br />APPROVAL <br />see notes <br />Notes: <br />LINDA <br />(425)870-7605 <br />JOEBATES100@MSN.COM <br />*PLEASE UPDATE INSPECTION TYPE AS NEEDED. I WAS NOT SURE WHAT TO SELECT FOR THIS SITUATION* <br />jmr changed Inspection Type from PLUMB 01-CONSULTATION to PLUMB 03-ROUGH IN <br />-verified via holes cut in first floor ceiling <br />7/12/2023 <br />F7/12/2023 <br />PLUMB 08-FINAL <br />JEFF M RHODE <br />F7R <br />FINPERMIT <br />FINAL <br />Notes: <br />425-870-7605 <br />JOEBATES100@MSN.COM <br />I <br />Printed: Thursday, 13 July, 2023 1 of 1 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.