Laserfiche WebLink
al Geminus Boeing Project Contract No.EVE-16-2929 <br /> Technology <br /> Development CEI Project No. 160731 <br /> I I <br /> I I - <br /> I 11 <br /> J II I I <br /> I I_ -_I . I --- <br /> _ I __sa <br /> , 1 <br /> I <br /> Mean of PercentOfLEL <br /> 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 <br /> 111111111116mainda idiiiiiti <br /> All <br /> Figure 58: Computed % of LEL levels at the entrances to the floor exhausts for Case <br /> 2/Scenario lb. <br /> Figure 59 shows the locations of the contour cuts in the paint hangar relative to the 45-04 <br /> C 1 D 1/C 1 D2 boundaries for all the subsequent graphics. Figure 60 through Figure 67 show <br /> contour x-sections of % of LEL for Case 2/Scenario lb Normal Paint Mode as referenced to in <br /> the permit application. <br /> 63 <br />