Laserfiche WebLink
L1LGemnus Boeing Project Contract No. E-16-2929 <br /> Technologyi Development CEI Project EVNo. 160731 <br /> 0' S' 10' <br /> Y Mean of PercentOfLEL <br /> .7 X 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 <br /> 111111111WI <br /> Figure 64: % of LEL contour cross section cut #4 (see Figure 59) for Case 2/Scenario <br /> l b. Length scale denoted in units of feet. <br /> a 5 10' <br /> Mean of PercentOfLEL <br /> 2 X alma 0.50 0.75 1.00 1.25 1.50 1.75 2.00 <br /> Figure 65: % of LEL contour cross section cut #5 (see Figure 59) for Case 2/Scenario <br /> lb. Length scale denoted in units of feet. <br /> 67 <br />