Laserfiche WebLink
ILGeminus Boeing Project Contract No.EVE-16-2929 <br /> Technology Development CEI Project No. 160731 <br /> Mean of PercentOfLEL <br /> ... 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 <br /> • <br /> Figure 76: % of LEL contour cross section cut #1 (see Figure 59) for Case 3/Scenario <br /> lb. Length scale denoted in units of feet. <br /> 1 <br /> Mean of PercentOfLEL <br /> .Z X 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.751.00 <br /> Figure 77: % of LEL contour cross section cut #2 (see Figure 59) for Case 3/Scenario <br /> lb. Length scale denoted in units of feet. <br /> 76 <br />