My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sound Transit 7/20/2023
>
Contracts
>
Agreement
>
Interagency Agreements (not grant agreements)
>
Sound Transit 7/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2023 4:31:31 PM
Creation date
7/20/2023 4:30:37 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sound Transit
Approval Date
7/20/2023
Council Approval Date
7/19/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
System Access Fund Project Agreement / Wall St Connector
Tracking Number
0003836
Total Compensation
$2,090,000.00
Contract Type
Agreement
Contract Subtype
Interagency Agreements (not grant agreements)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
System Access Fund Project Agreement Page 11 of 29 <br /> GA 0162-22 <br />Exhibit A: Scope of Work and Deliverables <br />The Everett Station Non-motorized Access Improvements project will build 1,200 linear feet of <br />pedestrian and bicycle improvements between Everett Station and the Angel of the Winds Arena. <br />Pedestrian improvements include: <br />•Construction of 600 linear feet of continuous, 10-foot-wide pedestrian facility with brick pattern <br />decorative surfacing on the east side of Paine Ave from the entrance to the Everett Station <br />visitor parking lot at 3102 Paine Ave to the intersection Paine Ave and Wall St. <br />•Construction of 500 linear feet of continuous, 8-foot-wide pedestrian facility with brick pattern <br />decorative surfacing on the north side of Wall St from the intersection of Wall St and Broadway <br />to the intersection of Wall St and Paine Ave. <br />•Pedestrian level lighting from the from the entrance to the Everett Station visitor parking lot at <br />3102 Paine Ave to the intersection Broadway and Wall St. <br />ADA improvements include: <br />•New, ADA compliant curb ramps at Wall St and McDougall and at the entrance to the Everett <br />Station visitor parking lot at 3102 Paine Ave. <br />•New, marked on-street accessible parking spaces on all blocks within the project limits. <br />Bicycle improvements include: <br />•Construction of 1,100 linear feet of continuous bicycle wayfinding, including signage with <br />distances to local destinations and pavement markings. <br />•Bicycle detection at Wall St and Broadway. <br />Traffic calming elements include: <br />•Road diet, narrowing vehicle lanes from 12 feet to 10.5 feet or 11 feet <br />•Construction of flagstone-pattern decorative surfacing flush bulbouts at the intersections of <br />Wall St and Broadway and Wall St and McDougall. <br />Deliverables include: <br />•Ad-ready PS&E for construction. <br />•Management of the ad and award process. <br />•Management during construction. <br />•Final construction of pedestrian and ADA improvements, bicycle improvements and traffic <br />calming elements.
The URL can be used to link to this page
Your browser does not support the video tag.