My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sound Transit 7/20/2023
>
Contracts
>
Agreement
>
Interagency Agreements (not grant agreements)
>
Sound Transit 7/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2023 4:31:31 PM
Creation date
7/20/2023 4:30:37 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sound Transit
Approval Date
7/20/2023
Council Approval Date
7/19/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
System Access Fund Project Agreement / Wall St Connector
Tracking Number
0003836
Total Compensation
$2,090,000.00
Contract Type
Agreement
Contract Subtype
Interagency Agreements (not grant agreements)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2930 Wetmore Ave, Ste 8-A <br />Everett, WA 98201 <br />425.257.8731 <br />425.257.8742 fax <br />planning@everettwa.gov <br />everettwa.gov <br />CITY OF EVERETT <br />Planning <br />Planning Director Decision <br />APPLICATION DETAILS <br />Project Name: Everett Station Non-motorized Access Improvements <br />Project File No.:REVI22-156 <br />Applicant:City of Everett Public Works – Christina Curtis <br />Date of Application:12.28.2022 <br />Date of Decision:12.29.2202 <br />PROJECT SITE <br />Project Location:From Pacific Avenue north along Smith Avenue and east of Broadway along Wall <br />Street <br />Zoning:MU, Mixed Urban <br />PROJECT DESCRIPTION <br />Request for a SEPA Exemption determination to construct 1,200 linear feet of pedestrian and bicycle <br />improvements between Everett Station and the Angel of the Winds Arena along Wall Street and Smith <br />Avenue. See Exhibit A for a complete description of the proposed project. <br />AUTHORITY, PROCESS, AND CRITERIA <br />WAC 197-11-800(2) states that the following activities shall be categorically exempt: <br />(2) Other minor new construction. <br />(d) The construction or installation of minor road and street improvements by any agency or private <br />party that include the following: <br />(viii) Reconstruction of existing roadbed (existing curb-to-curb in urban locations), including adding or <br />widening of shoulders where capacity is not increased and no new right of way is required; <br />(ix) Addition of bicycle lanes, paths and facilities, and pedestrian walks and paths including sidewalk <br />extensions, but not including additional automobile lanes. or replacement of structures may be exempt. <br />ANALYSIS <br />The proposed project involves minor street improvements within the existing right-of-way. The work <br />includes bicycle and pedestrian improvements and minor on-street parking and drainage changes.
The URL can be used to link to this page
Your browser does not support the video tag.