My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sound Transit 7/20/2023
>
Contracts
>
Agreement
>
Interagency Agreements (not grant agreements)
>
Sound Transit 7/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2023 4:31:31 PM
Creation date
7/20/2023 4:30:37 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sound Transit
Approval Date
7/20/2023
Council Approval Date
7/19/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
System Access Fund Project Agreement / Wall St Connector
Tracking Number
0003836
Total Compensation
$2,090,000.00
Contract Type
Agreement
Contract Subtype
Interagency Agreements (not grant agreements)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br />Public Works <br />RIGHT OF WAY CERTIFICATION <br />January 24, 2023 <br />Project Title: Everett Station Non-Motorized Access Improvements <br />Anticipated Ad Date: March 6, 2023 <br />Anticipated Bid Opening: March 28, 2023 <br />Local Agency: City of Everett <br />RIGHT OF WAY CERTIFICATION <br />The Everett Station Non-motorized Access Improvements project will build 1,100 linear feet of <br />pedestrian and bicycle improvements on Wall Street/Paine Avenue between the Angel of the Winds <br />Arena at Wall Street and Broadway and Everett Station on Paine Avenue. <br />Pedestrian improvements include: <br />•Construction of 1,100 linear feet of continuous pedestrian facility with brick pattern decorative <br />surfacing. <br />•Installation of pedestrian level lighting. <br />•New, ADA compliant curb ramps at Wall Street and McDougall Avenue and at the entrance to <br />the Everett Station visitor parking lot at 3102 Paine Ave. <br />•New, marked on-street accessible parking spaces on all blocks within the project limits. <br />Bicycle improvements include: <br />•Construction of 1,100 linear feet of continuous bicycle wayfinding, including signage with <br />distances to local destinations and pavement markings. <br />•Bicycle detection at Wall Street and Broadway. <br />Traffic calming elements include: <br />•Road diet, narrowing vehicle lanes from 12 feet to 10.5 feet or 11 feet <br />•Construction of flagstone-pattern decorative surfacing flush bulb outs at the intersections of <br />Wall Street and Broadway and Wall Street and McDougall Avenue. <br />Construction plan sheets, including right of way plan sheets, are attached. <br />All work done for public permanent improvements for the project will be done within City of Everett <br />right of way. The project requires removal of approximately 365 square feet of landscaping and chain <br />link fence constructed by MI Fluid Power Solutions on Paine Avenue within City of Everett right of way. <br />MI Fluid Power Solutions will be reimbursed for the loss of these improvements.
The URL can be used to link to this page
Your browser does not support the video tag.