Laserfiche WebLink
Sculpture Loan Agreement <br />Page 10 <br />Please note any handling instructions: <br /> <br /> My 1 ton truck with crane would be used for delivery and installation. Truck needs to be able to stand 3 feet <br />from the pedestal. 1 or 2 assistants would help. The 2 pieces of sculpture would be connected by pins and epoxy. <br /> <br /> <br /> <br /> <br />3. INSTALLATION AND REMOVAL <br /> <br />Will you install and remove the Work? Yes ( x ) No ( ) <br /> <br />What special requirements do you have for installation and removal of the work (e.g., pad, <br />connections, crane) <br /> <br /> Crane truck needs to be 3’ from the pedestal to install and remove sculpture. <br /> <br /> <br /> <br /> <br />The City shall not pay Lender for installation and removal of the Work. The City shall directly <br />or indirectly pay or arrange for third party services reasonably necessary for installation and <br />removal of the Work, including, but not limited to, a crane.