My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9610 19TH AVE SE DISH WIRELESS 2026-01-06
>
Address Records
>
19TH AVE SE
>
9610
>
DISH WIRELESS
>
9610 19TH AVE SE DISH WIRELESS 2026-01-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 9:16:11 AM
Creation date
7/27/2023 7:49:57 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9610
Tenant Name
DISH WIRELESS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG 0 2 2022 <br /> July 30,2021 <br /> CITY OF EVERETT ' <br /> Andrea Liu Tower Engineering Professionals <br /> SBA Network CommunicationsPermit Services 326 Tryon Road <br /> 8051 Congress Avenue Raleigh, NC 27603 <br /> Boca Raton, FL 33487 (919) 661-6351 <br /> (714)423-0563 Structures(a-)tepgroup.net <br /> Subject: Appurtenance Mount Analysis <br /> Carrier Designation: Dish Wireless Co-Locate <br /> Site Number: SESEA00361 C <br /> Site Name: SESEA00361C <br /> SBA Network Designation: Site Number: WA20096-A <br /> Site Name: Everett,WA <br /> Engineering Firm Designation: TEP Project Number: 147003.577435 <br /> Site Data: West of 9610 19th Avenue SE, Everett, <br /> Snohomish County,WA98208 <br /> Latitude 470 54'37.17", Longitude -122° 12'30.10" <br /> 150.0±Foot-Monopole Tower <br /> 150.0 Foot Mount Height- Platform <br /> Dear Andrea Liu, <br /> Tower Engineering Professionals is pleased to submit this "Appurtenance Mount Analysis" to determine the <br /> structural integrity of the antenna mount on the above mentioned tower. <br /> The purpose of the analysis is to determine acceptability of the mount's stress level. Based on our analysis we <br /> have determined the stress level for the mount structure, under the following load case, to be: <br /> LC1: Existing+ Proposed+ Reserved Loading Sufficient Capacity <br /> Note:See Table 2 for the existing,proposed,and reserved loading <br /> The analysis has been performed in accordance with the ANSI/TIA-222-H Structural Standard for Antenna <br /> Supporting Structures. Antennas. and Small Wind Turbine Support Structures and the 2018 Washington State <br /> Building Code. <br /> All equipment proposed in this report shall be installed in accordance with the appurtenances listed in Table 2 <br /> for the determined available structural capacity to be effective. <br /> We at Tower Engineering Professionals appreciate the opportunity of providing our continuing professional <br /> services to you and SBA Network Communications. If you have any questions or ne further assist ce on this <br /> or any other projects please give us a call. <br /> Structural analysis prepared by:Alex Holcomb/TWC DG <br /> F <br /> Respectfully submitted by: <br /> o <br /> z CO r Z � <br /> 0 �- <br /> Ronald E. Glover, P.E., S.E. "� � 52921 <br /> L g�G <br /> �SIONAL ECG <br /> 07/30/2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.