Laserfiche WebLink
Conclusions <br /> Based on the analysis results, the existing tower and foundation were found to be sufficient to safely support <br /> the equipment listed in this analysis. No modification to the tower and foundation is needed at this time. <br /> Installation Requirements <br /> This analysis was performed under the assumption that the carrier will place the proposed equipment and feed <br /> lines at the installation height listed in Table 4 and in accordance with the coax layout shown. TMAs and RRUs <br /> are to be installed on existing mounts behind tenant's antennas unless otherwise noted. No equipment is to be <br /> installed directly in the climbing path. All equipment is to be installed per mount manufacturer specifications. In <br /> case site conditions do not allow for the required installation parameters to be met the carrier must notify SBA <br /> Communications Corporation engineers for approval of an alternative placement. <br /> Page 6 S BA <br />