<br />GENERAL NOTES:
<br />1. DRAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS TAKE PRECEDENCE, THIS SET OF
<br />DOCUMENTS IS INTENDED TO BE USED FOR DIAGRAMMATIC PURPOSED ONLY, UNLESS NOTED
<br />OTHERWISE THE GENERAL CONTRACTORS SCOPE OF WORK SHALL INCLUDE FURNISHING ALL
<br />MATERIALS. EQUIPMENT, LABOR AND ANY REQUIREMENTS DEEMED NECESSARY TO COMPLETE
<br />INSTALLATION AS DESCRIBED IN THE DRAWINGS AND OWNERS PROJECT MANUAL
<br />Z. THE CONTRACTOR IS RESPONSIBLE FOR ALL DIMENSIONS AND STANDARDIZED DETAILS THAT
<br />REQUIRE MODIFICATIONS DUE TO ACTUAL FIELD CONDITIONS AND REQUIREMENTS MUST BE
<br />SUBMITTED TO AND APPROVED BY, T-MOBILE WIRELESS REPRESENTATIVE PRIOR TO START OF WORK
<br />3. PRIOR TO THE SUBMISSION OF BIDS, CONTRACTORS INVOLVED SHALLVISIT THE JOB SITE TO
<br />FAMILIARIZE THEMSELVES WITH ALL CONDITIONS AFFECTING THE PROPOSED PROJECT.
<br />CONTRACTORS SHALL VISIT THE CONSTRUCTION SITE WITH THE CONSTRUCTIOWCONTRACT
<br />DOCUMENTS TO VERIFY FIELD CONDITIONS AND CONFIRM THAT THE PROJECT WILL BE ACCOMPLISHED
<br />AS SHOWN. PRIOR TO PROCEEDING WITH CONSTRUCTION, ANY ERRORS, OMISSIONS, OR
<br />DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHMC17ENGINEER VERBALLY
<br />AND IN WRTING.
<br />4. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN AUTHORIZATION TO PROCEED WITH
<br />CONSTRUCTION PRIOR TO STARTING WORK ON ANY ITEM NOT CLEARLY DEFINED BY THE
<br />CONSTRUCTION DRAWINGSICONTRACT DOCUMENTS.
<br />5. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED IN THE CONTRACT
<br />DOCUMENTS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS.
<br />METHODS, TECHNIQUES, SEQUENCES, SAFETY. AND PROCEDURES FOR COORDINATING ALL PORTIONS
<br />OF THE WORK UNDER THE CONTRACT.
<br />6. THE CONTRACTOR SHALL INSTALLALL EQUIPMENT AND MATERIALS ACCORDING TO
<br />MAN UFACTURERSNENDORS SPECIFICATIONS UNLESS NOTED OTHERWISE OR WHERE LOCAL CODES
<br />OR ORDINANCES TAKE PRECEDENCE.
<br />7. ALLWORK PERFORMED ON THE PROJECTAND MATERIALS INSTALLED SMALL BE IN STRICT
<br />ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS, AND ORDINANCES. CONTRACTOR SHALL
<br />GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS AND LAWFUL
<br />ORDERS OF ANY PUBLIC AUTHORITY, MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS, AND LOCAL
<br />AND STATE JURISDICTIONAL CODES BEARING ON THE PERFORMANCE OF THE WORK
<br />S. GENERAL CONTRACTOR SHALL PROVIDE, AT THE PROJECT SITE, A FULL SET OF CONSTRUCTION
<br />DOCUMENTS UPDATED WITH THE LATEST REVISIONS INVOLVED WITH THE PROJECT. THIS SET IS A
<br />VAUD CONTRACT DOCUMENT ONLY IF THE TITLE SHEET IS STAMPED IN RED INK'FOR CONSTRUCTION'
<br />AND EACH SUCCESSIVE SHEET BEARS THE ARCHITECTSIENGINEER'S SIGNED WET STAMP.
<br />ABBREVIATIONS
<br />AC
<br />AFG
<br />ALUM
<br />ARCH
<br />B ADO
<br />BOT
<br />B.O.D
<br />SOS
<br />CLR
<br />COL
<br />CONIC
<br />CONST
<br />CONT
<br />CTR
<br />DTL
<br />EA
<br />ELEC
<br />EW
<br />EXT
<br />FIN
<br />FIN FUR
<br />FUR
<br />GA
<br />GALV
<br />GYP
<br />HM
<br />HOR
<br />HR
<br />HVAC
<br />INTUL
<br />OONDRIONING
<br />9. THE CONTRACTOR IS RESPONSIBLE FOR ADEQUATELY BRACING AM PROTECTING ALL WORK
<br />LEGENDS & SYMBOLS
<br />DURING CONSTRUCTION AGAINST DAMAGE, BREAKAGE, COLLAPSE, ETC. ACCORDING TO APPLICABLE
<br />CODES, STANDARDS, AND GOOD CONSTRUCTION PRACTICES.
<br />CHAIN LINK FENCE — x
<br />10. THE CONTRACTOR SHALL MEET ALL OSHA REQUIREMENTS FOR ALL INSTALLATIONS.
<br />CEDAR FENCE
<br />POWER — P — P — P — P — P — P — P — P —
<br />11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES TO THE EXISTING CONSTRUCTION
<br />TELCO — T — T — T — T — T — T — T — T —
<br />AND REPAIR ALL DAMAGES TO BETTER THAN NEW CONSTRUCTION THE CONTRACTOR SHALL NOTIFY
<br />PDWER/TELCO — — T — — T — P — T — P — T —
<br />THE CONSULTANT OF ANY DAMAGE TO THE BUILDING SITE OR ANY ADJACENT STRUCTURES AROUNDCOAX
<br />THEPROJECT. THE T•MOBILE REPRESENTATIVE SHALL BE SOLEANDRNALJUDGE AS TO THE QUALITY
<br />OFTHE REPAIRED CONSTRUCTION. ANY ADDITIONAL MODIFICATIONS WHICH MUST BE MADE SHALL BE
<br />OVERHEAD POWER
<br />MADE AT THE CONTRACTORS EXPENSE.
<br />CENTERLINE — — — — — — — —
<br />12 WHERE NEW PAYING, CONCRETE SIDEWALKS OR PATHS MEET EXISTING CONSTRUCTION, THE
<br />CONTRACTOR SHALL MATCH THE EXISTING PITCH, GRADE, AND ELEVATION SO THE ENTIRE
<br />STRUCTURE SHALL HAVE A SMOOTH TRANSITION.
<br />1& THE CONTRACTOR SHALL MODIFY THE EXISTING FLOORS, WALL, CEILING, OR OTHER
<br />CONSTRUCTION AS REQUIRED TO GAIN ACCESS TO AREAS FOR ALL MECHANICAL, PLUMBING,
<br />ELECTRICAL, OR STRUCTURAL MODIFICATIONS. WHERE THE EXISTING CONSTRUCTION DOORS.
<br />PARTITIONS, CEILING, ETC., ARE TO BE REMOVED, MODIFIED, OR REARRANGED OR WHERE THE
<br />EXPOSED OR HIDDEN MECHANICAL, ELECTRICAL, SYSTEMS ARE ADDED OR MODIFIED, THE GENERAL
<br />CONTRACTOR SHALL REPAIR, PATCH AND MATCH ALL EXISTING CONSTRUCTION AND FINISHES OF ALL
<br />FLOORS WADS AND CEILINGS. WHERE CONCRETE MASONRY CONSTRUCTION IS MODIFIED, THE
<br />CONTRACTOR SMALL TOOTH N ALL NEW CONSTRUCTION TO MATCH THE EXISTING BOND. WHERE
<br />CONCRETE CONSTRUCTION IS MODIFIED, THE CONTRACTOR SHALL VERIFY THE EXACT DETAILS TO BE
<br />USED FOR CONSTRUCTION. ALL WORK SHALL BE COVERED UNDER THE GENERAL CONTRACT.
<br />14. IF CONTRACTOR OR SUBCONTRACTOR FIND IT NECESSARY TO DEVIATE FROM ORIGINAL APPROVED
<br />PLANS. THEN IT IS THE CONTRACTORS AND THE SUBCONTRACTORS RESPONSIBIURY TO PROVIDE THE
<br />CONSULTANT WITH 4 COPIES OF THE PROPOSED CHANGES FOR HIS APPROVAL BEFORE PROCEEDING
<br />WITH THE WORK. IN ADDITION THE CONTRACTOR AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR
<br />PROCURING ALL NECESSARY APPROVALS FROM THE BUILDING AURIORTIES FOR THE PROPOSED
<br />CHANGES BEFORE PROCEEDING WITH THE WORK. THE CONTRACTOR AND SUBCONTRACTORS SMALL
<br />BE RESPONSIBLE FOR PROCURING ALL NECESSARY INSPECTIONS AND APPROVALS FROM BUILDING
<br />AUTHORITIES DURING THE EXECUTION OF THE WORK.
<br />15. CONTRACTOR TO PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2A
<br />OR 2.A70BC WITHIN 75 FEET TRAVEL DISTANCE TO ALL PORTIONS OF PROJECT AREA DURING
<br />CONSTRUCTION
<br />1S. THE CONTRACTOR SHALL PERFORM WORK DURING OWNERS PREFERRED HOURS TO AVOID
<br />DISTURBING NORMAL BUSINESS.
<br />17. SEAL ALL PENETRATIONS THROUGH FIRE -RATED AREAS WITH LLL LISTED OR FIRE MARSHAL
<br />APPROVIEDMATERIALSAS APPLJCABLETO THIS FACILITYAND OR PROJECT SITE
<br />T& CONTRACTOR SHALL BE RESPONSIBLE FOR UTILITY LOCATES, SCHEDWNG, COORDINATING
<br />SPECIAL AND BUILDING DEPARTMENT INSPECTIONS.
<br />19. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING AND UTILIZING ORIGINAL ROOFING
<br />CONTRACTOR AS REQUIRED TO MAINTAIN ANY EXISTING ROOFING WARRANTY.
<br />20. ROUTING OF ALL CONDUITS
<br />,CABLES, CABLE TRAYS ETC ARE INDICATED AS PROPOSED LOCATION
<br />ONLY. CONFIRM THE EXACT LOCATION AND ROUTING WITH THE ON SITE T-MOBILE CONSTRUCTION
<br />MANAGER PRIOR TO STARTING WORK
<br />REVISION BUG
<br />DETAIL NUMBER
<br />ELEVATION VIEW BUG
<br />SHEET NUMBER
<br />ELEVATION VIEW BUG
<br />T
<br />DETAIL NUMBER
<br />DETAIL BUG
<br />SHEET NUMBER
<br />DETAI NUMSER
<br />SECTION BUG
<br />SHEET NUMBER
<br />SPECIAL INSPECTIONS.
<br />SPECIAL INSPECTIONS IN ACCORDANCE WITH ISO 2015 SECTION 1704.
<br />SOILSIGEOTECHNICAL:
<br />❑ SHORING INSTALLATION AND MONITORING
<br />❑ OBSERVE AND MONITOR EXCAVATION
<br />❑ VERIFY SOIL BEARING ps1 BEARING
<br />❑ SUBSURFACE DRAINAGE PLACEMENT
<br />❑ VERIFY FILL MATERIAL AND COMPACTION
<br />D VERIFY CONDITIONS AS ANTICIPATED
<br />❑ PILE PLACEMENT (AUGER CASTMRNEN PILE)
<br />D OTHER
<br />REINFORCED CONCRETE:
<br />D REINFORCING STEEL AND CONCRETE PLACEMENT
<br />❑ PRESTRESSED/PRECAST CONCRETE FABRICATION AND ERECTION
<br />❑ BATCH PLANT INSPECTION
<br />❑ SHOTCRETE
<br />O GROUTING
<br />D OTHER
<br />STRUCTURAL STEEL:
<br />O FABRICATION AND SHOP WELDS
<br />❑ ERECTION AND FIELD WELDS AND BOLTING
<br />❑ OTHER:
<br />STRUCTURAL ALUMINUM:
<br />❑ FABRICATION AND SHOP WELDS
<br />❑ ERECTION AND FIELD WELDS AND BOLTING
<br />D OTHER:
<br />STRUCTURAL MASONRY:
<br />❑ CONTINUOUS
<br />❑ PERIODIC
<br />❑ OTHER:
<br />MISCELLANEOUS:
<br />❑ OTHER:
<br />ANCHORING TO CONCRETE:
<br />❑ BOLTS INSTALLED IN CONCRETE
<br />❑ PDST4NSTALLATION ADHESIVE ANCHORS
<br />D POST4NSTALLATION MECHANICAL ANCHORS
<br />31i3
<br />T . •Mobile•
<br />ROJECT INFORMATION,
<br />SEAWAY
<br />BLVD/PUD/WILLWER
<br />SE01613S
<br />2120 W CUINO RD
<br />EVERETT. WA692W
<br />8SU[D
<br />BUILDING PERMIT
<br />!VISION HISTORY,
<br />DKK.
<br />xn rTr IwlwwrT,D,A
<br />QrnvmzN
<br />Q1nY1@I
<br />MxtxxEv
<br />IBBiIEDDERtN KNEW
<br />M
<br />lAN6
<br />PREPMED
<br />BY,
<br />B. J. THOMAS, P.E.
<br />7607 BOTH AVE HE
<br />MARYSVILLE, WA 98270
<br />206.851.1106
<br />RAIN BYI�CMK. BY
<br />JL
<br />7
<br />CENSUREY
<br />,AA,A4
<br />♦ �.. (.'NOar1
<br />a
<br />x�
<br />7/1 3r
<br />•�41a�.�T�
<br />i
<br />WINO INFORMA71
<br />poxDTxuEduvnxas. wAlPacroAwsrvENlw
<br />ALLDIN❑b18NHPXDHDWH[ CINHUITaHr90FANY
<br />ETHRDIIBAHDDWE&DN8 atI PREVIW9 �OF1H9
<br />Ma1NNO NIEHUPEPHEDEDBYTHEIaIEef pK
<br />TKE NFORIM1bNC NED1115 HETDF
<br />DODDAEKT. PAOPPIETAM B1A.UPE, arry UHEOB
<br />MHCIaH W E o11EP Twx ww DM p nE V,TEO To xauED
<br />W ENI R SIRCfLY PRDI V BPE0.
<br />WINO TTLB
<br />GENERAL NOTES
<br />=Dmumme NUMBER,
<br />G-1
<br />
|