Laserfiche WebLink
0 <br />VERETT <br />Permit Inspections <br />City of Everett <br />12/1/2022 <br />12/1/2022 <br />BLDG 15-OTHER <br />RAKEEB KHAN <br />RESCHEDULE <br />eTRAKiT Inspection Request <br />ONLINE <br />Notes: <br />11/29/2022 12:34 PM James Cano <br />Pre Concrete Inspection. Concrete arrives at Noon <br />Contact Name: lames Cano <br />Site Address: 2828 COLBY AVE STE 200, 300 <br />Phone:2064724430 <br />e-Mail: jcano@hitt-gc.com <br />rescheduled for tomorrow. <br />12/2/2022 <br />12/2/2022 <br />BLDG 15-OTHER <br />RAKEEB KHAN <br />CORRECTION <br />REQUIRED <br />Notes: <br />11/29/2022 12:34 PM James Cano <br />Pre Concrete Inspection. Concrete arrives at Noon <br />Contact Name: lames Cano <br />Site Address: 2828 COLBY AVE STE 200, 300 <br />Phone:2064724430 <br />e-Mail: jcano@hitt-gc.com <br />11/29/2022 12:34:45 PM <br />Provide special inspection reports for in fill slab <br />Provide special inspection reports for in fill slab <br />12/2/2022 <br />12/2/2022 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />PARTIAL <br />see notes <br />APPROVAL <br />Notes: <br />11/30/2022 11:05 AM James Cano <br />Contact Name: James Cano <br />Site Address: 2828 COLBY AVE STE 200, 300 <br />Phone:2064724430 <br />e-Mail: jcano@hitt-gc.com <br />Interior walls framed up to ceiling. Walls located at infill slab not ready (storage/conference room wall). Waiting to pour concrete. Repair stud at duct <br />locations. <br />New interior walls framed up to ceiling. Walls located at infill slab not ready (storage/conference room wall). Waiting to pour concrete. Repair stud at <br />duct locations. <br />5/1/2023 <br />5/1/2023 <br />BLDG 13-CEILING <br />I RAKEEB KHAN <br />APPROVAL <br />eTRAKiT Inspection Request <br />GRID <br />Notes: <br />4/20/2023 9:35 AM James Cano <br />Contact Name: James Cano <br />Site Address: 2828 COLBY AVE STE 200, 300 <br />Phone:2064724430 <br />e-Mail: jcano@hitt-gc.com <br />5/1/2023 <br />5/1/2023 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />ACCEPTED <br />Notes: <br />See attached special inspection reports. For slab <br />Printed: Tuesday, 30 May, 2023 2 of 4 SUPERION <br />