My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2828 COLBY AVE KIMLEY HORN 2025-04-16
>
Address Records
>
COLBY AVE
>
2828
>
KIMLEY HORN
>
2828 COLBY AVE KIMLEY HORN 2025-04-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 1:34:52 PM
Creation date
7/27/2023 10:44:27 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2828
Tenant Name
KIMLEY HORN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />VERETT <br />Permit Inspections <br />City of Everett <br />12/1/2022 <br />12/1/2022 <br />BLDG 15-OTHER <br />RAKEEB KHAN <br />RESCHEDULE <br />eTRAKiT Inspection Request <br />ONLINE <br />Notes: <br />11/29/2022 12:34 PM James Cano <br />Pre Concrete Inspection. Concrete arrives at Noon <br />Contact Name: lames Cano <br />Site Address: 2828 COLBY AVE STE 200, 300 <br />Phone:2064724430 <br />e-Mail: jcano@hitt-gc.com <br />rescheduled for tomorrow. <br />12/2/2022 <br />12/2/2022 <br />BLDG 15-OTHER <br />RAKEEB KHAN <br />CORRECTION <br />REQUIRED <br />Notes: <br />11/29/2022 12:34 PM James Cano <br />Pre Concrete Inspection. Concrete arrives at Noon <br />Contact Name: lames Cano <br />Site Address: 2828 COLBY AVE STE 200, 300 <br />Phone:2064724430 <br />e-Mail: jcano@hitt-gc.com <br />11/29/2022 12:34:45 PM <br />Provide special inspection reports for in fill slab <br />Provide special inspection reports for in fill slab <br />12/2/2022 <br />12/2/2022 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />PARTIAL <br />see notes <br />APPROVAL <br />Notes: <br />11/30/2022 11:05 AM James Cano <br />Contact Name: James Cano <br />Site Address: 2828 COLBY AVE STE 200, 300 <br />Phone:2064724430 <br />e-Mail: jcano@hitt-gc.com <br />Interior walls framed up to ceiling. Walls located at infill slab not ready (storage/conference room wall). Waiting to pour concrete. Repair stud at duct <br />locations. <br />New interior walls framed up to ceiling. Walls located at infill slab not ready (storage/conference room wall). Waiting to pour concrete. Repair stud at <br />duct locations. <br />5/1/2023 <br />5/1/2023 <br />BLDG 13-CEILING <br />I RAKEEB KHAN <br />APPROVAL <br />eTRAKiT Inspection Request <br />GRID <br />Notes: <br />4/20/2023 9:35 AM James Cano <br />Contact Name: James Cano <br />Site Address: 2828 COLBY AVE STE 200, 300 <br />Phone:2064724430 <br />e-Mail: jcano@hitt-gc.com <br />5/1/2023 <br />5/1/2023 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />ACCEPTED <br />Notes: <br />See attached special inspection reports. For slab <br />Printed: Tuesday, 30 May, 2023 2 of 4 SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.