My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
215 SW EVERETT MALL WAY EVERETT POWER SPORTS 2023-07-28
>
Address Records
>
SW EVERETT MALL WAY
>
215
>
EVERETT POWER SPORTS
>
215 SW EVERETT MALL WAY EVERETT POWER SPORTS 2023-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2023 9:06:33 AM
Creation date
7/27/2023 11:51:17 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
215
Tenant Name
EVERETT POWER SPORTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IR ECTIt7NS: Read the WAC section below to determine if plan review is required or not required. Then select the trot next to (a) to <br />Il City Staff it plan review Is not requried and select the box next to the specific reason from WAC 286468-OW. if plan review is <br />quired, select the box next to (b) and (c) to acknowledge that plan review is required and the electrical plans have been provided <br />th this permit application, <br />item (a)-(ii, III, or v) Is selected, the work must DIU cotnpiyr with section (a)-(vii). See arrow flatly chart below. <br />Electrical plan review. <br />ED (a) Electrical plan review is Jl2t regui a for: <br />Cl 0) Low voltage systems; <br />(if) Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br />p (iii) Heating and cooling specific retrofit projects that result In an electrical load reduction on each existing feeder <br />involved In the project, provided there is not a corresponding increase In the available fault current in any feeder. <br />(Iv) Stand -atone utility fed services that, do riot exceed 250 volts, 400 amperes where the projects distribution system <br />® does not include: <br />(A) Emergency system other than listed unit equipment per NEC 700.12(F): <br />(B) An essential electrical system defined in NEC 517.2; or <br />(C;) A required fire pump system. <br />a----© (v) Modifications to existing electrical installations where all of the following conditions are met: <br />(A) :service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br />250 volts or for lighting circuits not exceeding 277 volts to ground; <br />(B) Does not involve emergency systems other than listed unit equipment per NEC 700.12 fl; <br />(C) Does not involve branch circuits or feeders of an essential eiectrieai system as defined In NEC 517.2; <br />and <br />(D) Service or feeder load calculations are increased by 6% or less. <br />(vi) Electric power production source(s) such as solar photovoltaic, fuel cell, or wind electric systern(s) with a total <br />rating of 9WO watts or less. <br />(vfi) For installations in (ar)(il), (iii), and (v) of this subsectlon to be considered, the following must be minable <br />LO to the electrtcai Inspector before the work Is Initiated: <br />(A) A clear and adequate description of the project's scope; <br />(8) A load calculafion(s); <br />(C) What the toad changes are, providing both before and after panel schedules as needed; and <br />P Provide information showing that the service and feeder(s) supplying the panel(s) where the work Is <br />tasking place has adequate capacity for any increased load and has code compffarlt overcurrent protection <br />for that supply. <br />NOTE: Electrical plan review Is not required for "Medical, dental, and chiropractic clinic" of which is a clinic or <br />0 physiclans' office where a patients are not regularly kept as bed patients for twenty-four hours or more, per section <br />(b) Electrical plan review Is required for all other new or altered electrical projects in educational, institutional, or health care <br />occupancies defined In this chapter. <br />(d) if a review is required, the electrical plan must be submitted for review and approval before the electrical work Is begun. <br />t+N>fe-"" <br />t it ;aw►.nw�iar4r1*,#A irtY' <br />moll Ka 14W <br />r <br />is <br />Its <br />iAq,�.tif rq <br />a <br />'vfi� <br />9oud nirw <br />. ire <br />moft <br />v <br />r«ffi <br />• %atrlC • , <br />Yi{i <br />Ai!® hw»ie <br />Yas <br />rrltii/i <br />alas <br />tre�tmetilracr,, ' <br />yr <br />BtNianned x�eaiea <br />vss- <br />lf�{)tfrtY.fi�ttlS!tfta;r <br />Y!5 <br />Xatls 9tib-3 <br />du Cta *i opd it aR nn#tl i �cUi�,;P i i-* Ai"inhly, tat t OW FAciHNea. <br />., �I#1'E�ltt: �I,..triT�iCrl/l'1Jlti, O: <br />c3iifriin.F r <br />�.✓f11(� RiilY�plr; <br />�fr�nHr <br />3'es <br />err <br />9 ,tai?ataiecilp4l-t nwi'W $ i.40a <br />T,X40t?, i1v aei�crrrr rna <br />tM #Y r #11*0}lan FaVieW rail 4rrky typ*z iwr <br />PEi 1TP#p 2-Plan r(OVIOW <br />
The URL can be used to link to this page
Your browser does not support the video tag.