My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
215 SW EVERETT MALL WAY EVERETT POWER SPORTS 2023-07-28
>
Address Records
>
SW EVERETT MALL WAY
>
215
>
EVERETT POWER SPORTS
>
215 SW EVERETT MALL WAY EVERETT POWER SPORTS 2023-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2023 9:06:33 AM
Creation date
7/27/2023 11:51:17 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
215
Tenant Name
EVERETT POWER SPORTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br />Engineering/Public Services <br />3200 Cedar Street <br />(425) 257-8810 <br />NO I <br />CEToS Op WORK <br />These premises at EVE-1�� A'1AO havebeen uj -- <br />by the City of Everett Public Works Department pursuant to Everett Municipal odes and/or the current <br />Design and Construction Standards and Specification for the City of Everett and deficiencies/ violations <br />have been noted per the following: <br />❑ E.M.C. Title 13 (streets'and sidewalks) CI E.M.C. Title 16 (clearing, grubbing,'grading, excavation <br />❑ E.M.C. Title 14 (water) ❑ E.M.C. Title 19 (zoning, steep slopes) ) <br />❑ E.M.C. Title 14 (sanitary sewer) ❑ E.M.C. Title 20 (environmental) <br />1�❑ Title 14 (storm sewer) ❑ E.M.C. Title 46 (traffic) <br />Title 16 (building& construction) ) ❑Other -a0p <br />❑ Design and construction standards and specifications. <br />© Pro ect specifications and special erovis.inn <br />i <br />The <br />have been <br />The following work shall be stopped until the bove defects/violations are resolved to the satisfaction of <br />the Director of Public Works or his designee: <br />- WARNING <br />The failure to stop work or the resumption, of work without permission of the Director of Public, <br />Works or .his designee, or the removal, mutilation, destruction or concealment of this order, or the <br />'failure to take and/or complete any required corrective actions shall constitute a violation of <br />ordinance no. 894-82 (as it is or is hearafter amended) which is punishable by a maximum tine.of <br />$500 and/or imprisonment' for six months. Each separate day, Ye or any prtion there of; during wh`lch <br />any violation occurs or continues, shall be deemed to constitute a se arate offense, <br />Posted: at 5�'✓l� -Bali red To: <br />A.M. ,., <br />P.M. Date 12, -7 — / 7 P:M. <br />By By <br />act Public Works Department at 425-257-8810 for further information <br />N,O i'l C EToS <br />
The URL can be used to link to this page
Your browser does not support the video tag.