Laserfiche WebLink
EVERETT <br />WASHINGTON <br />0 <br />DEMOLITION <br />PERMIT <br />AY OF EVERETT <br />PERMIT SERVICES <br />3200 CEDAR STREET EVERETT, WA 98201 <br />(425) 257-8810 <br />Online Inspection Request: pw.everettwa.aov <br />PERMIT NUMBER: D2104_004 <br />DATE <br />JOB ADDRESS: 4320 THOMSON AVE <br />APN: 00605501600303 <br />S7t <br />APPROVALNO <br />OWNER: Ryan Kilby <br />TENANT: <br />2023 <br />:ARCHIVED <br />2517 Colby Avenue <br />Everett WA 98201 <br />PHONE: 4253550353 <br />PHONE: <br />DESCRIPTION OF WORK- <br />Complete demolition of existing SFR <br />CONTRACTOR: ,JKW GENERAL LLC <br />19801 50TH AVE W <br />NOTES' <br />LYNNWOOD <br />WA 98036 <br />SFR is vacant and all utilities disconnected <br />4257500667 <br />CONTRACT PRICE OF WORK: <br />$50.00 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. This permit for demolition/removal of building structure only and is subject to field inspection. <br />2. All existing connected water services shall be capped at the back side of the meter prior to demolition of the structure. Owner to <br />contact Utilility Billing to shut off water service and stop billing by sending an email to utilbill@everettwa.gov. <br />3. All existing connected side sewers shall first obtain a separate utility permit for a side sewer cap -off and then be capped at the <br />property line prior to demolition of the structure. <br />4. All existing electrical services shall first obtain an ELECTRICAL ONLINE permit, and then disconnect electrical service prior to <br />demolition of the structure. <br />5. All applicable abatement (asbestos, lead paint, rodent, etc.) shall be completed prior to demolitions per state, local, and federal <br />regulations. It is the owner/applicant's responsibility to contact the appropriate authority and comply with these requirements whether <br />or not described herein. <br />6. Erosion and sedimentation control measures per City standards shall be taken prior to and throughout the demolition. <br />7. No site work, clearing, grading, excavating, or earthwork permitted except to restore building pad after demolition. Building pad area <br />shall be graveled or re -vegetated. No exposed soils permitted. <br />8. No dirt/debris to be tracked onto roadway. <br />9. Request a PW SITE FINAL inspection type online at pw.everettwa.gov when the demolition is completed to close out this permit. <br />PERMITS EXPIRE IF WORK NOT COMMENCED WITHIN 180 DAYS OR CEASES MORE THAN 180 DAYS. <br />FEES <br />DEMOLITION <br />STATE SURCHARGE IRC <br />Total Fees <br />Total Fees Paid <br />Total Fees Due <br />REMARKS: <br />ACKNOWLEDGEMENT OF CONDITIONS <br />$50.00 By purchasing this permit and commencing work, the <br />owner/applicant hereby agrees to the above listed permit <br />$6.50 conditions and agrees to hold and save harmless the City <br />of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of <br />the construction hereto applied for and further agrees to <br />$56.50 remove same upon notice from the City. <br />$0.00 City of Everett Local <br />USales Tax Code is3105. <br />AY 16 2022 PERMIT NO. <br />rM� <br />. <br />D2104-004 <br />HTly OF EVERETT ADDRESS FILE COPY <br />Permit Services <br />