My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington Department of Ecology 7/27/2023
>
Contracts
>
Agreement
>
Grant
>
Washington Department of Ecology 7/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 4:07:39 PM
Creation date
7/27/2023 4:06:29 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington Department of Ecology
Approval Date
7/27/2023
Council Approval Date
6/21/2023
End Date
6/30/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Regional Stormwater Faclity Planning
Tracking Number
0003852
Total Compensation
$401,480.00
Contract Type
Agreement
Contract Subtype
Grant
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement No. WQC-2023-EverPW-00118 <br />WATER QUALITY COMBINED FINANCIAL ASSISTANCE AGREEMENT <br />BETWEEN <br />THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY <br />AND <br />CITY OF EVERETT <br />This is a binding Agreement entered into by and between the state of Washington , Department of Ecology, hereinafter <br />referred to as “ECOLOGY,” and City of Everett, hereinafter referred to as the “RECIPIENT,” to carry out with the <br />provided funds activities described herein. <br />Regional Stormwater Facility Planning <br />GENERAL INFORMATION <br />Project Title: <br />Total Cost: <br />Total Eligible Cost: <br />Ecology Share: <br />Recipient Share: <br />The Effective Date of this Agreement is: <br />The Expiration Date of this Agreement is no later than: <br />Project Type: <br />Project Short Description: <br />This project will ultimately improve water quality through further analysis of the Receiving Water Conditions Assessment <br />developed as part of the Stormwater Management Action Plan to identify stormwater facility locations within the City of <br />Everett. This project will produce a Regional Facility Report, Adaptive Management Plan, and Conceptual Design <br />Report to include at least five facility designs to address receiving water impairments from existing developed and <br />anticipated redevelopment areas. <br />Project Long Description: <br />The City of Everett’s surface water service system is comprised of three watersheds and 22 major drainage basins <br />which total over 11,000 acres. The three watersheds are Port Gardner/Possession Sound Watershed, the Snohomish <br />Watershed, and the Lake Washington Watershed . The surface water service system is managed by the RECIPIENT to <br />protect and enhance the City’s downstream receiving waters , and ultimately the Puget Sound. <br />$401,480.00 <br />$401,480.00 <br />$301,110.00 <br />$100,370.00 <br />07/01/2022 <br />06/30/2025 <br />Stormwater Facility <br />DocuSign Envelope ID: 2DF45A90-96AE-464E-848B-4CA1529CAE01
The URL can be used to link to this page
Your browser does not support the video tag.