Laserfiche WebLink
. <br /> ORDINANCE NO. 2695 <br /> AN ORDINANCE approving and confirming the assessment <br /> and assessment roll of LOCAL IMPROVEMENT DISTRICT No. 516, for <br /> the improvement of Sixteenth Street from Rockefeller Avenue to <br /> Walnut Street , by clearing and grubbing, removal of old lumber, <br /> grading to proper grade, removal of existing curbs, walks and <br /> pavement as necessary, installation of necessary drainage , <br /> construction of a one course Portland cement concrete pavement <br /> from Rockefeller Avenue to Broadway Avenue by two strips of <br /> cement concrete pavement nine feet wide, Broadway Avenue to <br /> McDougall Avenue by two strips of cement concrete pavement <br /> seven feet wide, McDougall Avenue to Rainier Avenue by re- <br /> inforced cement concrete pavement , street width between curbs <br /> to be thirty (30) feet, and Rainier ..venue to Walnut Street by <br /> two strips of cement concrete pavement seven feet wide; also <br /> -Rockefeller to mcDougall Avenue , Rainier Avenue to Cedar Street , <br /> Maple Street to Walnut Street by re-topping existing asphalt <br /> pavement with asphalt concrete; Rockefeller Avenue to Walnut <br /> Street by construction of cement concrete curbs, also construction <br /> of curb and gutters as necessary; paving alley crossings and <br /> replacement of concrete sidewalks to fit new work, the making <br /> of the necessary changes at the intersections and doing all <br /> other necessary work for a complete improvement , under <br /> Ordinance do. 2663 of the City of Everett, levying an assess- <br /> ment on account thereof against the several lots, tracts and <br /> parcels of land or other property as shown on said roll, and <br /> providing for the issuance of bonds therefor. <br /> THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: That the assessment and assessment roll <br /> in Local Improvement _District No. 516 for the improvement of <br /> Sixteenth Street from Rockefeller Avenue to Walnut Street, <br /> by clearing and grubbing , removal of old lumber, grading to <br /> proper grade , removal of existing curbs, calks and pavements <br /> as necessary, installation of necessary drainage, construction <br /> of a one course Portland cement concrete pavement, from <br /> Rockefeller Avenue to Broadway Avenue by two strips of Portland <br /> cement concrete pavement nine feet wide, street width between <br /> curbs to be thirty-four (34) feet; Broadway Avenue to <br /> mcDougall Avenue by two strips of Portland cement concrete <br /> pavement seven (7) feet wide , street width between curbs to <br /> be thirty (30) feet; from McDougall Avenue to Rainier <br /> Avenue by reinforced Portland cement concrete pavement, <br /> street width between curbs to be thirty (30) feet; from Rainier <br /> Avenue to Walnut Street by two strips of ro: tland cement con- <br /> crete pavement seven (7) feet wide , street width between curbs <br /> to be thirty (30) feet; also Rockefeller Avenue to McDougall <br /> Avenue , Rainier Avenue to Cedar Street, Maple Street to Walnut <br /> Street by re-topping existing asphalt pavement with asphalt <br /> concrete; and also from Rockefeller Avenue to Walnut Street <br /> by the construction of Portland cement concrete curbs, curbs and <br /> gutters as necessary, paving alley crossings and replaceaent of <br /> concrete sidewalks to fit new work, making of necessary changes <br /> at intersections , and the doing of all other work necessary <br /> to make a complete improvement , <br />