Laserfiche WebLink
• fb <br /> SNO ISLE KITCHEN UPGRADES <br /> UTILITY 12 MONTH PEAK DEMAND CALCULATION WORKSHEET <br /> PANEL 'MDB2' <br /> NEC 220.87 AND WAC 296-46B-900(3)(j) <br /> 12 Month Peak Demand (Month &Year) : October 2019 <br /> Phase to Phase Voltage (Volts) : 480 <br /> Phases (1=Single Phase, 3=Three Phase) : 3 <br /> Utility Peak Demand = 150 KW <br /> Power Factor / 0.90 (P.F.) <br /> Apparent Peak Demand = 166.67 KVA <br /> NEC 220.87(2)adjustment factor X 1.25 KVA <br /> Adjusted Peak Demand = 208.33 KVA <br /> Seasonal adjustment factor X 1.00 KVA <br /> Seasonal adjustment peak demand = 208.33 KVA <br /> Occupancy adjustment factor X 1.00 KVA <br /> Occupancy adjustment peak demand = 208.33 KVA <br /> Other adjustement factor(s) X 1.00 KVA <br /> Utility Peak Demand with Adjustments = 208.33 KVA <br /> New Calculated Demand Load Added K2' + 13.13 KVA <br /> Metered Demand Based <br /> CALCULATED DEMAND LOAD : 221.46 KVA <br /> CALCULATED DEMAND CURRENT : 266 AMPS <br /> - U <br /> OCT 0 8 2021 <br /> CITY OF EVERETT <br /> Permit Services <br />