Laserfiche WebLink
PUBLIC WORKS PERMIT <br />Date Applied: <br />6/9/2023 <br />City of Everett Permit Services <br />Public Works Permit k: <br />PW2306,009 <br />3200 Cedar Street, 2v Floor <br />Associated Bldg Permitk: <br />EVERETTEverett, <br />WA 98201 <br />Planning Reference ll: <br />everettwa.eov/permits <br />Public Works Fee: <br />$299.24 <br />WASHINGTON <br />Perm itSeryiceskl everettwa.gov <br />Schedule Inspections at: onlinamermitteverieryereov <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />CLINE PATRICK L & CHERYL A AA PLUMBING LLC <br />930 COLBY AVE 3527 238TH ST HE <br />EVERETT, WA 98201-1318 ARLINGTON, WA 98223 <br />PHONE: PHONE: 4254890123 <br />SITE ADDRESS: 930 COLBY AVE TAX PARCEL ID B: MUS41750IND <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: NEW/ REPL PAVING OF EXISTING DRIVEWAY, APPROX 800 SO FT <br />PERMITCONDITIONS: <br />1. All inspections shall be scheduled online at Tons ://ormiummermits.everettwa.eov. Available inspection dates are shown In the dropdown <br />menu. <br />2. Al work shall be performed in accordance with the Permit and current City of Everett 'Design and Construction Standards and <br />Specifications for Development. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 822. <br />4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department. Approved plans must remain on job -site at <br />all times. <br />5. Inspections are required for all stages of construction. Visittbe City's Online Permitting Portal at onlinepermits.everet[wa.gov to formally <br />request all required inspections. <br />6. Install and maintain erosion control measures per City of Everett Standards and perthe direction of the PW Inspector and the approved <br />SW PPP/TESC Plan. Remove upon completion of the project bull final approval of the permit. <br />2. Keep City streets clean at all times. No dirt, mud, rocks, ordebris to be tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. Any damage to City improvements sidewalk, curb, roadway, etc) shall be replaced per City Standards and/or as directed by the City PW <br />Inspector. <br />10. It is the appikenVowneYs responsibility to ensure that stormwater runoff from new/replaced imperious surfaces will be managed on -site <br />in a manner that does not adversely affect neighboring properties, including the Oy's rightrof-way and/or easements and the <br />improvements located therein. <br />11. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained <br />from the City's Traffic Engineering Division. This permit can be applied for online at onlinepermits.everetthaa.gov and requires a traffic <br />control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br />12. This permit must be finaled in Omer to close out his permit. Request a final inspection online by selecting PW 25-Site Final/Permit Close <br />Out within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br />PERMIT FEE BREAKDOWN <br />Paving (8005F) <br />$4S.00 <br />PW Plan Review <br />$20.00 <br />PW Site Inspection <br />$20.00 <br />Stormwater System Dew Fee ROO 5F) <br />$214.24 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant hereby agrees to hold and saes harmless the Chy of Everett from any and all claims bar <br />damages, costs, expenses, or causes a action that may adsebecame of lnswill and maintenance of the lmprovementorother right - of way use here to applied <br />for and summer cases W remow same upon noticefrom McCity and to replace public property damaged thereby. <br />VALIDITY/EXPIRATION: <br />Work authorized by this permft must be started within 180 days of date permit Is Issued and thereafter Is W be diligently pursued to completion. This permit may <br />be canceled by the 6W upon vty stoppage of work on this project over pill duration. Each inspection commit the expiration date 190 data to keep the Permit <br />open "us work is am,,. <br />Page 1 of 1 <br />_APPUCAm//DgsITECOY _Alsii _TRE/suam <br />