My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8923 EMERSON PL 2023-07-31
>
Address Records
>
EMERSON PL
>
8923
>
8923 EMERSON PL 2023-07-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 3:53:52 PM
Creation date
7/31/2023 8:44:08 AM
Metadata
Fields
Template:
Address Document
Street Name
EMERSON PL
Street Number
8923
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/30/2022 -- , Page <br /> City of Everett <br /> 7:04i140AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. PLW2105-001 Site Address 8923 EMERSON PL <br /> Applied 5/13/2021 Applicant Mebet Tadege Lot <br /> Approved 5/17/2021 Owner Mebet Tadege Block <br /> Issued 5/19/2021 Contractor Mebet Tadege Tract <br /> Parent Permit No. BW2007-002 Description Plumbing for two bathrooms and a clothes washer <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> ADMIN OTHER TAH see notes-may need (5/17/2021 7:17 AM TAH) <br /> to add to permit Owner indicated that they are only <br /> plumbing 2 bathrooms and a clothes washer <br /> -no mention of any kitchen plumbing_a <br /> if <br /> you do find they have done plumbing in the <br /> kitchen,we can add to this permit and they <br /> can pay the differance. <br /> 8/4/2021 8/4/2021 PLUMB TAHU RESCHEDULE <br /> 03-ROUGH IN <br /> 8/4/2021 8/4/2021 PLUMB TAHU OTHER (8/4/2021 1:45 PM TAHU) <br /> 02-GROUND Checking on the code with adult family <br /> homes,I will get back with owner <br /> 8/5/2021 8/5/2021 PLUMB TAHU CORRECTION (8/5/2021 10:21 AM TAHU) <br /> 02-GROUND tahu changed Inspection Type from <br /> PLUMB 03-ROUGH IN to PLUMB <br /> 02-GROUND WORK/SLAB <br /> (8/5/2021 10:27 AM TAHU) <br /> ICC chapter 6 plumbing elements and <br /> facilities,move toilet 18 inches off any <br /> sign wall or cabinet in bathroom <br /> I gave owner a copy of chapter 6 ICC to <br /> under stande facilities and grab bar Heights <br /> (8/11/2021 8:36 AM SDP) <br /> Requests an AM inspection. <br /> 8/12/2021 8/12/2021 PLUMB SDP PARTIAL APPR AM request (8/12/2021 7:42 AM SDP) <br /> 02-GROUND Disreguard notes left on inspection dated <br /> 08-05-21. <br /> Adult family homes shall follow codes from <br /> IRC section R325. <br /> (8/12/2021 10:49 AM SDP) <br /> This is for the bath room in the garage <br /> remodeled area.Ok groundwork as noted: <br /> verify that your grab bar layout will work <br /> between the fixtures.I am told that the <br /> shower will not have a threshold and the <br /> whole bathroom will be tiled.The toilet <br /> grab bars MUST be within the required <br /> spread and height.The back wall shower <br /> grab bar can be shortened,if necessary,but <br /> the required height of this grab bar must be <br /> maintained. <br /> 8/18/2021 8/18/2021 PLUMB SDP APPROVAL (8/18/2021 1:51 PM SDP) <br /> 02-GROUND Photos are in attachments:toilet was moved <br /> back to the original position.You should <br /> have 15"clearance from the center of the <br /> toilet to the edge of the shower.Note:the <br /> shower will not have a threshold,will be <br /> roll in and the entire bathroom will be tiled <br /> and sloped toward the shower drain. <br /> 9/7/2021 9/7/2021 PLUMB SDP APPROVAL (9/7/2021 9:53 AM SDP) <br /> 03-ROUGH IN Both bathrooms are approved for rough in. <br /> INSP 12 CRI11/s YS (- <br />
The URL can be used to link to this page
Your browser does not support the video tag.