My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3620 36TH PL NE 2023-07-31
>
Address Records
>
36TH PL NE
>
3620
>
3620 36TH PL NE 2023-07-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 11:12:47 AM
Creation date
7/31/2023 11:08:37 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH PL NE
Street Number
3620
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER POLLUTION PREVENTION PLAN CERTIFICATION FORM <br /> CEDAR GROVE COMPOSTING, EVERETT FACILITY <br /> EVERETT, WASHINGTON <br /> The Permittee shall use this form to sign and certify that the Stormwater Pollution Prevention Plan(SWPPP) <br /> is complete,accurate,and in compliance with Conditions S3 and S8 of the Industrial Stormwater General <br /> Permit(ISGP). <br /> • A SWPPP certification form needs to be completed and attached to all SWPPPs. <br /> • Each time a Level 1, 2,or 3 Corrective Action is required,this form needs to be re-signed and re- <br /> certified by the Permittee,and attached to the SWPPP. <br /> Is this SWPPP certification in response to a Level 1,2 or 3 Corrective Action?❑Yes ® No <br /> If Yes:Type of Corrective Action?: n Level 1 ❑ Level 2 n Level 3 <br /> • Date SWPPP update/revision completed: December 16,2021 <br /> "I certify under penalty of law, that this SWPPP and all attachments were prepared under my direction or <br /> supervision in accordance with a system designed to assure that qualified personnel properly gather and <br /> evaluate information to determine compliance with the Industrial Stormwater General Permit. Based on my <br /> inquiry of the person or persons who are responsible for storm water management at my facility, this SWPPP <br /> is, to the best of my knowledge and belief, true, accurate, and complete, and in full compliance with Permit <br /> Conditions S3 and S8, including the correct Best Management Practices from the Storm water Management <br /> Manual for Western Washington. I am aware that there are significant penalties for submitting false <br /> information, including the possibility of fine and imprisonment for knowing violations." <br /> J.Stephan Banchero President <br /> Operator's Printed Name * Title <br /> Operator's Signature* Date <br /> *Federal regulations require this document to be signed as follows: <br /> For a corporation, by a principal executive officer of at least the level of vice president;for a partnership <br /> or sole proprietorship, by a general partner or the proprietor, respectively;or for a municipality,state, <br /> federal,or other public facility, by either a principal executive officer or ranking elected official. <br /> This document shall be signed by a person described above or by a duly authorized representative of that <br /> person.A person is a duly authorized representative only if: 1)The authorization is made in writing by a <br /> person described above and submitted to Ecology, and 2)The authorization specifies either an individual or a <br /> position having responsibility for the overall operation of the regulated facility,such as the position of plant <br /> manager,superintendent, position of equivalent responsibility,or an individual or position having overall <br /> responsibility for environmental matters. <br /> Changes to authorization: If an authorization under number 2 above is no longer accurate because a <br /> different individual or position has responsibility for the overall operation of the facility, a new authorization <br /> satisfying the requirements of number 2 above shall be submitted to Ecology prior to,or together with,any <br /> reports, information,or applications to be signed by an authorized representative. <br /> Stormwater Pollution Prevention Plan <br /> Cedar Grove Composting,Everett Facility iii December 16,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.