Laserfiche WebLink
3.4 Stormwater Peak Runoff Rate and Volume Control BMPs (S3.B.4.b.iv) 3-26 <br /> 3.5 Erosion and Sediment Control BMPs(53.B.4.b.v) 3-26 <br /> 4.0 STORMWATER MONITORING PLAN (S3.6.5) 4-1 <br /> 4.1 Stormwater Monitoring Events 4-1 <br /> 4.2 Sampling Criteria 4-2 <br /> 4.3 Stormwater Monitoring Procedures 4-2 <br /> 4.3.1 Visual Stormwater Monitoring 4-2 <br /> 4.3.2 Obtaining Sampling Kit Materials 4-3 <br /> 4.3.3 Stormwater Sampling 4-4 <br /> 4.4 Records Retention 4-5 <br /> 4.5 Review of Monitoring Results and Corrective Action 4-6 <br /> 4.5.1 Level One Corrective Actions —Operational Source Control BMPs 4-7 <br /> 4.5.2 Level Two Corrective Actions —Structural Source Control BMPs 4-7 <br /> 4.5.3 Level Three Corrective Actions—Treatment BMPs 4-8 <br /> 4.5.4 Submitting the Monitoring Results to Ecology 4-9 <br /> Stormwater Pollution Prevention Plan <br /> Cedar Grove Composting,Everett Facility vi December 16,2021 <br />