Laserfiche WebLink
PUBLIC WORKS PERMIT <br />Date Applied: <br />1/20/2023 <br />City of Everett Permit Services <br />Public Works Permit N: <br />PW2301408 <br />E V E R E T T <br />3200 Cedar Street, 2n° Floor <br />Everett, WA 98201 <br />Associated Bldg Permit N: <br />Planning Reference N: <br />WASHINGTON <br />everettwa.eov/permits <br />Public Works Fee: <br />$65.00 <br />PermitServices0everettwa.gov <br />schedule Inspections aat:onllnenermRe.everettwoenv <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />BREITHAUPT STEPHEN A STEPHEN BREITHAUPT <br />3725 FEDERAL AVE <br />EVERETT, WA 98201 <br />PHONE: PHONE: 4252992443 <br />SITE ADDRESS: 3725 FEDERAL AVE TAX PARCEL ID g: 006050(10300700 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: 3.SFT VINYL PICKET FENCE ALONG FEDERAL AVE <br />NOTES: INCLUDING A GATE AT THE MIDWAY POINT, 3.SFT CHAIN LINK ALONG DRIVEWAY INCLUDING A GATE AT THE QUARTER POINT. <br />PERMR CONDITIONS: <br />1. All Inspections shall be scheduled online at hops://onlineoermits.everettwa.eov. Available inspection dates are shown in the dropdown <br />2.eAll work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br />for Development. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. The fence shall be no greater than 3'L (42") in height within the front Setback or the abutting right-of-way (shortest property <br />frontage, unless otherwise noted or previously determined). <br />S. The fence shall be not greater than 6 feet in height within the street side setback or the abutting right-of-way and no greater than T <br />feet in height within the Interior side or rear setback. <br />6. Fence height, material, transparency, and location shall comply with all standards set forth in EMC 19.40. <br />T. Protect all existing underground utilities during construction. Fence posts shall be at least 2ft away from any underground utility. <br />Water meters shall remain outside of fenced areas to be kept clear and accessible for maintenance and monthly meter reading. <br />8. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at onlinepetmits.everettwa.gov to <br />Formally request all required inspections. A handout is provided at permit issuance with instructions on how to request an inspection <br />online <br />9. This fence constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever <br />requires use of the right-of-way for municipal purposes. <br />10. The owner/applicant is responsible for establishing the center of the alley way. <br />11. This permit must be finaled in Omer to close out this permit. Request a final inspection online by selecting PW 25-Site Final/Permit <br />Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br />PUBLIC WORKS PERMIT FEE BREAKDOWN: <br />Fence in Right -Of -Way... ................................ $25.00 <br />PW Plan Review .......................................... $20.00 <br />PW Site Inspection ...................................... $20.00 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant hereby agrees to hold and save harmless the Ciry of Everett from any and all <br />claims for damages, torts, expenses, or causes of action that may arise because of installation and maintenance of the improvement or other right- <br />of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br />VALIDITY/EXPIRATION: <br />Work authorized by this Permit must be started within 180 days of date permit Is issued and thereafter is W be diligently pursued to completion. This <br />permit may be canceled by the city upon any Stoppage of work on this project met trial duration. Each Inspection extends the expiration date <br />180 days to keep the permit open while work is active. <br />Page 1 of 1 <br />_APPLICANT/IOB SITE COPY _ADDRESS FILE _TREASURER <br />