My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3903 FRIDAY AVE 2023-07-31
>
Address Records
>
FRIDAY AVE
>
3903
>
3903 FRIDAY AVE 2023-07-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 11:36:15 AM
Creation date
7/31/2023 11:26:40 AM
Metadata
Fields
Template:
Address Document
Street Name
FRIDAY AVE
Street Number
3903
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPLETE IF USING INFILTRATION (2A or 2B) TO MEET FLOW <br />CONTROL REQUIREMENT <br />Determine whether infiltration has been pre -determined to be infeasible for any portion of your <br />project site. <br />© Review the infiltration infeasibility mapping tool available on "Map EVBre1P' <br />e <br />. werettwagnwmapewerett <br />On the mappingtool, select"Geotechnicapinfiltration Infeasibility Area" and the <br />applicable "Property" layers from the Layer List. <br />• Zoom into your project site and printthe resulting map to showthe project site <br />boundaries and the infiltration infeasibility mapping results. <br />• Areas mapped as red have been pre -determined to be infeasible for infiltration. <br />• Areas mapped as green are potentially feasible for infiltration and must be <br />assessed further for infiltration feasibility, as discussed further below. <br />® Attach a printed copy of the map clearly showing your project site boundary and the <br />infiltration infeasibility mapping results. <br />* If you selected Downspout Full Infiltration (2A), submit I and 2 below. <br />If you selected Rain Gardenf lloretention (2B), on -site soils information for sizing is <br />required from I through 3 below. <br />Submit the following information to Permit Services with this report: <br />I. A USDA Custom Soil Report from httos://websoilsu"ey.sc.eeov.usda.gov <br />2. USDA Soil Type(s)= <br />3. Measured Infiltration Rate = isdhr, measured at BMP location on -site. Use Rain Garden <br />Handbook methodology for infiltration test. <br />City ofEvereb Public works <br />Small Project Slarmweler Sce Plan Reporl rorPneecfs in 16 <br />Me Co coned Sewer AreaSepbmber 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.